SCP-3026
Euclid
~
medium confidence
SCP-3026
Expected annual
$1.3M
One-time setup
$2.9M
Annual recurring
$1.3M
Personnel
9
First-year one-time capital/setup costs are approximately $2,878,500 driven by specialized reinforced containment, acoustic isolation, redundant power/lighting, remote-handling robotics, and contingency reserves; recurring annual costs are approximately $1,295,000 driven primarily by staff wages, ongoing research/monitoring, maintenance, and legal/cover-story expenses.
One-Time Capital Costs
Total: $2.9M
Annual Recurring Costs
Total: $1.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.3M/yr
Uneventful year with normal operations, maintenance, and research; no containment incidents.
no incidents
scheduled maintenance
routine research
🚨
Minor Incident
$1.4M/yr
Limited containment incident causing medical treatments, localized repairs, overtime, and cleanup; no full breach or public exposure.
limited breach/entry attempt
medical trauma to staff
localized structural/equipment damage
🚨
Major Breach
$3.8M/yr
Severe containment failure with fatalities, major structural/equipment damage, extended shutdown, legal exposure and rebuild.
full containment breach
fatalities or major structural damage
public/legal exposure requiring rebuild
Personnel
9 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 4 | [#9] Four full-time security guards for 24/7 shift coverage (4 × $55,000). |
| Containment Technician | 2 | [#9] Two containment technicians for operations and maintenance (2 × $85,000). |
| Research Scientist / Lead Researcher (PI) | 1 | [#9] One lead researcher responsible for experiments and oversight ($160,000). |
| Engineer / Maintenance (on-call) | 1 | [#9] One maintenance/electrician on-call for technical systems and generator maintenance ($90,000). |
| Medical Officer / Psychologist (part-time/on-call) | 1 | [#9] One medic/psychologist for acute care and long-term counseling ($100,000 equivalent/yr, part-time/on-call). |
Confidence Notes
Analyst notes provide detailed line-item estimates for most categories and explicit recurring figures, supporting medium confidence; uncertainty remains around incident probabilities, in-house lab purchase decisions, and site-specific construction/site-prep variances.