SCP-3056
Euclid
~
medium confidence
SCP-3056
Expected annual
$27.8M
One-time setup
$51.0M
Annual recurring
$27.4M
Personnel
49
Estimated one-time setup costs are approximately $51.05M driven by BSL-4 retrofitting, research/ABSL suites, isolation cells, and munitions stockpiles; recurring annual costs are approximately $27.41M driven by staff wages, ongoing research/surveillance, detainee operations, and contingency reserves.
One-Time Capital Costs
Total: $51.0M
Annual Recurring Costs
Total: $27.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$27.4M/yr
Normal operational year with no major incidents; routine surveillance, research, and containment activities only.
no outbreaks
routine surveillance
no controlled burns
🚨
Minor Incident
$28.4M/yr
Localized on-site controlled burn or small containment incident requiring limited incineration and remediation.
small on-site burn
localized remediation
limited ordnance use
🚨
Major Breach
$207.4M/yr
Large-scale release or decision to perform wide-area incendiary containment requiring significant ordnance use, evacuation, remediation and recompense.
urban-scale incendiary burn
widespread contamination
major legal/political fallout
Personnel
49 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 6 | [#9, #15] BSL-4 virology and countermeasure research staff. |
| BSL-4 Technician | 8 | [#9, #15] Laboratory technicians for ABSL/BSL operations and sample handling. |
| Clinician / Medical Officer | 3 | [#14, #15] Infectious disease clinicians and medical monitoring staff. |
| Security Officer / MTF Agent | 20 | [#2, #15] 24/7 security for detention cells, site security, and escort duties. |
| EOD / Ordnance Technician | 4 | [#4, #15] Trained ordnance staff to manage thermobaric cache and controlled burns. |
| Engineer / Maintenance | 4 | [#3, #27, #22] HVAC, waste treatment, generator and facilities maintenance staff. |
| Administrative Staff | 3 | [#19, #24] Administrative, liaison and records/cover-story support. |
| Site Director / Executive Staff | 1 | [#15] Site director and executive oversight. |
Confidence Notes
Estimates are mid-range aggregations from wide ranges in the analyst notes; many items (munitions, burn-scale, compensation) are highly scenario-dependent which reduces precision.