SCP-3065
Euclid
~
medium confidence
SCP-3065
Expected annual
$6.8M
One-time setup
$12.6M
Annual recurring
$6.7M
Personnel
40
First-year one-time capital and reserve costs are substantial (seed reserves and remote-site buildout), with ongoing annual operations driven primarily by continuous security staffing, specialized rapid-response capability, and logistics for a remote site. Expected first-year one-time costs are dominated by contingency reserves and outpost construction, while recurring costs are dominated by personnel and transportation/response contracts.
One-Time Capital Costs
Total: $12.6M
Annual Recurring Costs
Total: $6.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$6.7M/yr
Normal year with no major containment incidents; routine operations, maintenance, and planned testing continue.
no incidents
routine maintenance
scheduled testing only
🚨
Minor Incident
$6.9M/yr
Localized containment incident (single-person disappearance requiring targeted response, small equipment replacement and limited amnestic use).
single-person surface disappearance
small amnestic deployment
minor equipment repairs
🚨
Major Breach
$8.7M/yr
Significant containment event requiring large amnestic operations, substantial equipment replacement, multi-day QRF deployment and legal/PR mitigation.
multiple witness exposures
extended QRF deployment
major equipment failure
🚨
Catastrophic Breach
$16.7M/yr
Catastrophic containment failure or expansion necessitating full-scale evacuation/closure, large settlements and long-term remediation; draws on contingency reserves.
rapid expansion of anomaly
mass public exposure
decision to permanently close/quarantine land
Personnel
40 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 18 | [#4] Minimum coverage: ~6 guards per shift × 3 shifts (18) for patrols, gate and monitoring. |
| Security Supervisor | 2 | [#4] Supervisory oversight and shift leads; included as supervisory overhead in security staffing estimates. |
| Quick-Reaction Team | 6 | [#5] Rotatable, specialized armed response contingent for containment incidents (regional rotation reflected as on-call headcount). |
| Research Scientist / Technician | 8 | [#9] Multidisciplinary scientific staff (geology, anthropology, cognitive, data scientists, lab techs); mid-range 6–10 FTE used. |
| Medical Officer / Nurse | 2 | [#10] Onsite nurse plus rotating/telemedicine physician support; covers trauma and counseling needs. |
| Engineer / Maintenance | 2 | [#2, #13] Maintenance staff for generators, power systems, vehicles, and field equipment. |
| Administrative Staff / Cover Story Operators | 2 | [#16, #18] Staff managing cover story operations, local liaisons, PR and administrative duties. |
Confidence Notes
Analyst notes provide detailed line items and ranges enabling a mid-confidence estimate, but large ranges on several items (reserves, variable amnestic/family settlement costs, and catastrophic contingencies) and anomalous behavior of SCP-3065 introduce significant uncertainty.