SCP-3076
Euclid
~
medium confidence
SCP-3076
Expected annual
$2.0M
One-time setup
$2.0M
Annual recurring
$1.9M
Personnel
12
Initial containment setup requires moderate capital construction (aviary, quarantine cells, secure equipment) and specialized non-digital monitoring systems; ongoing costs are dominated by continuous security staffing and a sustained research/monitoring program, with significant contingency for hazardous disposal and legal/cover-up retainers.
One-Time Capital Costs
Total: $2.0M
Annual Recurring Costs
Total: $1.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.9M/yr
Normal year with steady operations, no major containment incidents; routine research, security, and maintenance.
no breaches
routine research activity
🚨
Minor Incident
$2.1M/yr
Small containment incident (localized contamination, one or two contaminated works requiring disposal and limited amnestic/legal work).
localized contaminated artwork
small external exposure
limited hazardous disposal events
🚨
Major Breach
$3.4M/yr
Significant breach requiring large-scale containment, multiple subject terminations, mass disposal and extended legal/cover operations.
site breach
widespread cognitohazardous works produced
multiple tertiary-stage infections
🚨
Public Exposure
$6.9M/yr
Public leak or exposure leading to major legal, PR, mass remediation, and societal-scale mitigation efforts.
public leak
mass distribution of cognitohazardous works
multi-site exposure
Personnel
12 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#4] Six guards providing 24/7 coverage (two per shift). |
| Security Supervisor | 1 | [#4] One supervisor for oversight and substitution across shifts. |
| Avian Specialist / Animal Caretaker | 1 | [#5] Full-time specialist for feeding, cleaning and enrichment. |
| Research Scientist | 3 | [#14] Multidisciplinary research team (neuroscience, psychology, memetics) — headcount consistent with recurring research budget. |
| Lab Technician | 1 | [#14] Laboratory technician supporting experiments and sample handling. |
Confidence Notes
Estimates are based on analyst ranges and reasonable midpoints; many items (amnestic/legal incident costs, frequency of major breaches, research scope) are highly uncertain, producing medium confidence rather than high.