SCP-3115
Euclid
~
medium confidence
SCP-3115
Expected annual
$1.1M
One-time setup
$1.3M
Annual recurring
$1.1M
Personnel
10
First-year one-time setup and contingency funding are approximately $1.35M driven by structural soundproofing, Faraday shielding, specialized test rigs and a contingency fund; ongoing annual operations are ~ $1.05M/yr driven primarily by staff wages (security and memetics), maintenance, and legal/cover-story costs.
One-Time Capital Costs
Total: $1.3M
Annual Recurring Costs
Total: $1.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.1M/yr
Normal year with no containment incident; routine operations, maintenance, staffing, and research continue.
no_incident
scheduled_maintenance
routine_testing
🚨
Minor Incident
$1.2M/yr
Localized containment incident requiring incident response, limited amnestic use, independent review and legal/PR spike.
single_test_breach
limited_staff_exposure
post-incident_review
🚨
Major Breach
$2.8M/yr
Site-level breach requiring broad amnestic campaigns, quarantine, facility repairs and significant legal/PR and remediation costs.
site_wide_breach
multiple_staff_casualties
large_scale_amnestic_campaign
🚨
Catastrophic Breach
$11.1M/yr
Uncontrolled memetic propagation beyond site requiring mass amnestic campaigns, national-level emergency response, relocation and major legal/PR remediation.
uncontained_memetic_spread
mass_casualties
national_exposure
Personnel
10 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#12] Two guards per shift with three shifts for continuous coverage (6 total active guard positions). |
| Security Specialist | 1 | [#12] Rapid-response/security specialist (on-call/roving specialist). |
| Research Scientist (Memetics) | 1 | [#11] Full-time memetics researcher assigned primary oversight of SCP-3115. |
| Research Support Technician | 1 | [#11, #19] Support personnel for data capture, analysis and experiment logistics. |
| Senior Researcher / Level 4 Signatory | 1 | [#11, #13] Rotating Level 4 signatory allocated (partial FTE cost accounted in staff_wages). |
Confidence Notes
Detailed analyst line items and a documented incident support mid-level confidence in recurring and one-time categorization and magnitude; wide ranges on contingent catastrophic costs and memetic behavior introduce significant uncertainty in large-incident estimates.