SCP-3117
Euclid
~
medium confidence
SCP-3117
Expected annual
$14.1M
One-time setup
$6.7M
Annual recurring
$13.7M
Personnel
32
Initial capital costs are dominated by a $5.0M worst-case contingency plus facility/equipment buildouts (~$1.65M); annual operations (monitoring, staffing, MTF operations, legal/mitigation) are approximately $13.7M/yr, driven by personnel, MTF operations, subject care, and mitigation budgets.
One-Time Capital Costs
Total: $6.7M
Annual Recurring Costs
Total: $13.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$13.7M/yr
Normal operational year with no major incidents; routine monitoring, investigations, and mitigation activities only.
no major breach
routine deployments and research
regular takedown activity
🚨
Minor Incident
$14.5M/yr
Localized containment/takedown response or a small breach requiring additional field operations, legal actions, and contracting.
localized online spread
one or more complex takedown operations
targeted field recovery
🚨
Major Breach
$23.7M/yr
Significant public exposure / mass‑exposure event requiring large-scale public mitigation, mass medical response, and extensive legal/PR campaigns.
widespread dissemination across media
mass exposure
multi-jurisdictional legal and public-health emergency
Personnel
32 total
| Role | Count | Notes |
|---|---|---|
| Human Analyst / Moderator | 10 | [#5] Ten analysts for 24/7 coverage per analyst team assumption; matches analyst budget. |
| Engineer / ML Engineer | 2 | [#2] Ongoing maintenance crew (1 FTE engineer + ML ops ~0.5 FTE rounded to 2 total engineers represented in wages). |
| Security Officer / MTF Agent | 12 | [#7] Standing MTF deployment and rapid response team of 12 (investigators, CIs, security) per note. |
| Research Scientist / Technician | 8 | [#12] Research staff: 4senior researchers + 4 technical staff as described. |
Confidence Notes
Estimates are aggregated directly from analyst line items and midrange choices where ranges were given. Many costs (MTF investigations, subject care census, covert mitigation, worst-case impacts) are highly variable; documented line-item estimates were used but program scope and true incident frequency create moderate uncertainty.