SCP-3134
Euclid
~
medium confidence
SCP-3134
Expected annual
$7.4M
One-time setup
$73.0M
Annual recurring
$7.1M
Personnel
30
Estimated one-time capital costs are approximately $73.05M dominated by containment construction, UXO clearance and contingency reserves; recurring annual costs are approximately $7.08M driven primarily by specialist staffing, ongoing UXO mitigation/ordnance procurement, and cover/legal/PR costs.
One-Time Capital Costs
Total: $73.0M
Annual Recurring Costs
Total: $7.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$7.1M/yr
Normal operational year with no major incidents; routine UXO upkeep, feeding, surveillance and staffing.
routine_operations
scheduled_maintenance
🚨
Minor Incident
$7.6M/yr
Localized surge in detonations or equipment damage requiring emergency disposal, replacement and overtime.
localized_detonation
equipment_damage
minor_civilian_exposure
🚨
Major Breach
$12.1M/yr
Large uncontained detonation or SCP movement into tourist areas causing mass amnestic operations and major emergency response.
mass_exposure
large_uncontained_detonation
civilian_casualties
🚨
Containment Escalation
$17.1M/yr
Severe escalation requiring use of escalation reserve, extraction attempts or emergency large-scale engineering works.
containment_failure
extraction_attempt
mass_infrastructure_damage
Personnel
30 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 12 | Frontline security and patrols, multilingual/local liaison (part of #1 staffing estimate). |
| EOD Specialist | 4 | Explosive ordnance disposal teams for UXO handling and feeding operations (#1). |
| Medical Officer | 3 | Field medics for trauma stabilization and amnestic administration (#1, #13). |
| Research Scientist | 4 | Researchers/analysts for monitoring, data analysis and limited field research (#1, #9, #18). |
| Driver / Field Technician | 5 | Drivers, field techs and drone/operators for logistics and robotic systems (#1, #6, #7). |
| Site Command / Administrative Staff | 2 | Command, liaison, admin and legal/cover coordination (included in staffing and cover costs #1, #15). |
Confidence Notes
Estimates are based on analyst ranges in notes and reasonable midpoints; many items (UXO clearance scope, containment scale, frequency/severity of detonations) are uncertain, so overall confidence is medium.