SCP-3140
Unknown
~
medium confidence
SCP-3140
Expected annual
$4.5M
One-time setup
$20.4M
Annual recurring
$4.4M
Personnel
26
Initial one-time containment and facility buildout is estimated at approximately $20.4M driven primarily by hangar/testing suite construction, BSL-style upgrades, long-term retirement/contingency reserves and specialized infrastructure. Recurring annual costs are roughly $4.42M/year dominated by security and specialist research staff, utilities and ongoing R&D/monitoring.
One-Time Capital Costs
Total: $20.4M
Annual Recurring Costs
Total: $4.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.4M/yr
Normal, uneventful operational year with routine testing and no containment incidents.
routine testing
scheduled maintenance
no activations/breaches
🚨
Minor Incident
$5.2M/yr
Localized activation or accidental partial activation requiring emergency immobilization, repairs, overtime and limited external support.
accidental vocal activation
localized structural damage from 'stomp' command
limited medical/hazmat response
🚨
Major Breach
$12.4M/yr
Significant containment breach or coordinated reactivation requiring large-scale emergency response, infrastructure rebuild, public evacuation or long-term sequestration.
full-scale breach/escape
replication/seeding of environment
public exposure/evacuation
Personnel
26 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 14 | [#12] Continuous armed security (3 shifts) — headcount chosen to match the staffing cost midpoint used. |
| Security Supervisor | 3 | [#12] Supervisory staff overseeing shifts and rapid-response coordination. |
| Research Scientist | 4 | [#13] Mid-level researchers (botany/chemistry/linguistics) included in researcher staffing budget. |
| Senior Thaumaturgist | 2 | [#13] Senior thaumaturgic specialists/Project Lead included in research staffing. |
| Medical Officer | 2 | [#14] Onsite medics for trauma and inhalation/toxic incidents. |
| Hazmat Specialist | 1 | [#14] Hazmat lead for spill/biological containment response. |
Confidence Notes
Estimates use midpoints of wide ranges provided in analyst notes and map each numbered item to categories; however large uncertainties remain (site-specific construction costs, choice between meteoritic iron vs engineered restraints, and uncertain anomalous behavior), so confidence is medium.