SCP-3150
Thaumiel
~
medium confidence
SCP-3150
Expected annual
$14.5M
One-time setup
$11.8M
Annual recurring
$14.1M
Personnel
35
Initial startup capital is estimated at roughly $11.8M one-time for site acquisition, retrofitting, power/water/communications and laboratory setup; ongoing annual operations are roughly $14.1M driven by staff wages, liaison/influence, security, logistics and contingency reserves.
One-Time Capital Costs
Total: $11.8M
Annual Recurring Costs
Total: $14.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$14.1M/yr
Normal operational year with routine missions, no major incidents.
scheduled Sadra Initiative missions
routine maintenance
regular liaison payments
🚨
Minor Incident
$14.6M/yr
Small operational incident (localized exposure, minor equipment damage, short evacuation or targeted bribery).
localized security breach
small-scale exposure
short emergency evacuation
🚨
Major Breach
$19.1M/yr
Significant compromise requiring large-scale evacuation, asset relocation, legal settlements and major rebuilding.
site compromise
sustained hostile interdiction
major exposure or destruction of facilities
🚨
Political Exposure
$17.1M/yr
Diplomatic or geopolitical exposure requiring crisis buyouts, major legal defense and international mitigation.
media/public exposure
host-nation diplomatic incident
large-scale discovery by third parties
🚨
Research Breakthrough Requiring Scale Up
$16.1M/yr
Sudden discovery from SCP-3150-3 that requires rapid prototype funding and scale-up (containment tech or field systems).
actionable SCP-3150-3 insight
urgent prototype/deployment request
unexpected scale-up requirements
Personnel
35 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 20 | Primary on-site covert security staff; figure based on note #9 (12–30 personnel). Salaries included in staff_wages. |
| Research Scientist | 15 | Core Sadra Initiative researchers (PIs, postdocs, field operatives, analysts); corresponds to note #12 staffing budget. Salaries included in staff_wages. |
Confidence Notes
Line-item ranges were provided in analyst notes, enabling a reasoned mid-range estimate, but political/geopolitical factors, rare high-impact events and the highly variable nature of implementation costs reduce precision.