SCP-3152
Safe
✓
high confidence
SCP-3152
Expected annual
$350K
One-time setup
$432K
Annual recurring
$342K
Personnel
2
One-time setup costs of $431,500 (locker modifications, amnestic stockpile, traceback seed, and contingency reserve) with recurring annual costs of $341,000 driven mainly by potential response operations, amnestic replenishment, and optional research. Main cost drivers are amnestic readiness, contingency/response funds, and optional research.
One-Time Capital Costs
Total: $432K
Annual Recurring Costs
Total: $342K/yr
Cost Scenarios
📊
Baseline
(baseline)
$342K/yr
Normal uneventful year with no major incidents; routine inspections, amnestic replenishment, SOP refresher, and contingency fund maintained.
no civilian exposures
no large-scale recoveries
no active research program
🚨
Minor Incident
$361K/yr
Single small civilian exposure or a small recovery operation requiring a field team and 1–3 amnestic administrations.
1–3 civilian exposures
single localized retrieval operation
one-time legal/liaison activity
🚨
Major Outbreak
$841K/yr
Multiple active SCP-3152-1 instances in civilian circulation requiring mass retrievals, many amnestic administrations, large field ops, legal settlements, and PR response.
dozens+ infected letters found
widespread civilian exposure
public attention requiring PR/legal response
🚨
Research Program
$591K/yr
Site authorizes the optional research program with regular controlled experiments and staffing of a small research team.
approval of controlled contact experiments
dedicated research staff and D-class usage
Personnel
2 total
| Role | Count | Notes |
|---|---|---|
| Containment Technician / Containment Tech | 1 | [#3] Responsible for monthly inspections/chain-of-custody checks; estimated 0.05 FTE equivalent covered in staff_wages. |
| IT / Database Administrator (fractional) | 1 | [#17] Fractional IT/incident-logging support (~$10,000/yr) to manage secure logging, redaction, and searches; counted as one fractional role. |
Confidence Notes
Notes provide detailed line-item estimates and typical Foundation practices; major remaining uncertainty is whether optional items (mail scanner purchase vs contract, research program activation, scale of outbreaks) are enacted. Core administrative costs and amnestic readiness are well-specified.