SCP-3176
Unknown
~
medium confidence
SCP-3176
Expected annual
$68.7M
One-time setup
$438.4M
Annual recurring
$64.2M
Personnel
100
Estimated first-year one-time capital outlay is approximately $438,350,000, dominated by prototype fabrication, lab/power infrastructure and a dedicated contingency reserve; recurring annual costs are approximately $64,220,000, driven primarily by prototype test campaigns, specialized personnel, covert logistics/black-ops, and ongoing software/compute maintenance.
One-Time Capital Costs
Total: $438.4M
Annual Recurring Costs
Total: $64.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$64.2M/yr
Normal year with routine testing and operations; no major timeline incidents.
routine_testing
scheduled_deployments
software_and_compute_maintenance
🚨
Minor Incident
$69.2M/yr
Localized split-timeline event or prototype misfire requiring targeted remediation, additional amnesticization and legal cover-up.
small_split_timeline
prototype_misfire
localized_containment_failure
🚨
Major Breach
$264.2M/yr
DT-Class Split Timeline or catastrophic prototype failure requiring large-scale redeployments, payout from contingency fund and broad amnestics/cleanup.
DT-Class_split_timeline
widespread_paradox
mass_casualties_or_infrastructure_loss
Personnel
100 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist / Chronoengineer | 30 | [#7] Core temporal R&D team and specialist engineering staff included in staff_wages. |
| Security Officer / MTF Agent | 50 | [#8] Timeline operations cadre (MTF-η-⊃) and retention/hazard pay accounted in staff_wages. |
| Software Developer / Systems Engineer | 10 | [#12, #13] Developers and systems staff supporting cross-temporal detection, logging and compute operations; costs rolled into staff_wages and software maintenance. |
| Documentation / Continuity Personnel | 5 | [#25] Record-handlers and continuity staff to maintain cross-iteration access chains; included in staff_wages. |
| Ethical Review / Administrative Staff | 5 | [#20] Oversight, legal liaison and administrative staff for ethical review and program governance; included in staff_wages. |
Confidence Notes
Estimates are based on wide ranges in analyst notes and high uncertainty around prototype scale, frequency of time-operations, and whether existing Foundation assets are reusable; major cost drivers are well-identified but magnitudes vary by orders of magnitude.