SCP-3180
Safe
~
medium confidence
SCP-3180
Expected annual
$4.8M
One-time setup
$4.9M
Annual recurring
$4.7M
Personnel
12
Initial one-time startup and contingency reserves drive capital costs (~$4.9M), while staff, amnestic administration, medical follow-up, surveillance, and overhead dominate recurring costs (~$4.68M/yr). Major outbreak scenarios can add multiple millions on top of baseline recurring expenditures.
One-Time Capital Costs
Total: $4.9M
Annual Recurring Costs
Total: $4.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.7M/yr
Uneventful operational year with steady containment, routine surveillance, scheduled research and no major outbreaks.
no outbreak
routine operations
scheduled research activity
🚨
Minor Incident
$5.2M/yr
Localized spike in SCP-3180 presence requiring targeted mass-capture, extra amnestic administrations and short-term surge resources.
localized population surge
cluster of affected households
small media attention requiring extra PR/legal
🚨
Major Outbreak
$9.3M/yr
Widespread outbreak/saturation requiring mass amnesticization, large-scale capture, emergency relocation and significant legal/compensation payouts.
rapid population saturation
simultaneous multiple-household outbreaks
public exposure / litigation
Personnel
12 total
| Role | Count | Notes |
|---|---|---|
| Site Director / Executive Staff | 1 | [#3] Oversees operations and covert engagement. |
| Research Scientist | 1 | [#3] Lead scientific investigator for mechanism and R&D. |
| Medical Officer / Med/Amnestic Tech | 2 | [#3] Clinical administration of amnestics and medical triage. |
| Animal Control / Field Ops | 3 | [#3] Capture teams, humane handling and transport of specimens. |
| Security Officer / MTF Agent | 4 | [#3] Site security, transport security and covert perimeter control. |
| Administrative Staff | 1 | [#3] Admin, procurement, and local liaison duties. |
Confidence Notes
Estimates are mid-range, expert-opinion order-of-magnitude figures with many line-item ranges provided. Good coverage of likely cost drivers exists, but population dynamics, public reaction, and R&D duration introduce material uncertainty.