SCP-3189
Euclid
~
medium confidence
SCP-3189
Expected annual
$5.3M
One-time setup
$28.8M
Annual recurring
$5.2M
Personnel
23
One-time setup and contingency reserves dominate costs (property purchase, heavy mechanical integration, full-deployment research reserve). Annual operations are mid-single-digit millions driven by staff wages, research, security, and specialist contracts.
One-Time Capital Costs
Total: $28.8M
Annual Recurring Costs
Total: $5.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$5.2M/yr
Normal year with scheduled research, routine maintenance and no containment incidents.
routine_operations
scheduled_research
no_incidents
🚨
Minor Incident
$5.4M/yr
Localized mechanical failure or contamination requiring crane/repairs, MTF response and limited remediation.
mechanical_failure
partial_ring_damage
localized_contamination
🚨
Major Breach
$10.2M/yr
Significant anomalous activation or containment breach causing contamination, extended remediation, personnel medical events and possible partial decommissioning.
containment_breach
reality_restructuring_event
site_decontamination
🚨
Political Exposure
$6.2M/yr
Local discovery or investigation requiring major cover-up operations, legal settlements and increased PR/legal spending.
public_disclosure
local_investigation
civil_claims
Personnel
23 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 8 | [#7] On-site 24/7 armed guards with shifts and supervisors; count consistent with security wage estimate. |
| Thaumatologist (Senior) | 2 | [#11] Senior thaumaturgists (1–2 suggested in notes). |
| Research Scientist | 4 | [#11] Research scientists for thaumaturgy/physics experiments. |
| Technician | 4 | [#11] Lab and mechanical technicians for maintenance and experiments. |
| Engineer / Maintenance | 2 | [#3, #22] Mechanical/control engineers and contractor coordination for ring systems and heavy maintenance. |
| Administrative Staff | 2 | [#11, #20] Admin and security liaison, plus cover-story administration. |
| Site Director / Executive Staff | 1 | [#11] Site-level responsible manager/executive oversight. |
Confidence Notes
Analyst notes provide detailed line-item ranges but many costs (research scale, contingency needs, breach probabilities) are uncertain; estimates are middling conservative choices within wide ranges.