SCP-3195
Euclid
~
medium confidence
SCP-3195
Expected annual
$15.4M
One-time setup
$25.4M
Annual recurring
$14.8M
Personnel
43
Initial one-time capital and retrieval costs are approximately $25.35M, driven by construction of Provisional Site-44, salvage/retrieval operations, and site outfitting. Annual recurring operations are approximately $14.789M/yr, dominated by global disinformation/PR, staff wages, maritime enforcement, and legal/communications costs.
One-Time Capital Costs
Total: $25.4M
Annual Recurring Costs
Total: $14.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$14.8M/yr
Normal year with steady containment, routine monitoring, and no major incidents.
routine monitoring
scheduled maintenance
regular Celestia Events
🚨
Minor Incident
$15.8M/yr
Localized containment incident or public leak requiring elevated emergency response and PR surge.
localized structural damage
unplanned Celestia Event drawing attention
small-scale leak or intrusion
🚨
Major Breach
$39.8M/yr
Public exposure, large-scale breach, or forced decommissioning requiring major legal, remediation and PR spending.
public exposure / widespread observation
mass intrusion or attempted removal
high-profile legal action or forced remediation
Personnel
43 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 20 | [#6] 24/7 armed security, boat patrols, quick reaction force, supervisors; 3 shifts. |
| Research Scientist | 8 | [#4] Full-time containment scientists (astrophysicists, biologists, materials scientists) — 6–10 FTEs assumed; midpoint used. |
| Lab Technician | 3 | [#4, #5] Lab techs supporting medical/forensics sampling and instrumentation operations. |
| Medical Officer | 4 | [#5] Full-time on-site medical team and trauma/forensics support for sampling and wound management. |
| Engineer / Maintenance | 3 | [#13, #14, #19] Power/HVAC technicians, scaffold/corrosion control and general facility maintenance staff. |
| Data Scientist | 2 | [#11, #12] Data analysis, image processing and storage/backup management for Celestia Event records. |
| Administrative Staff | 2 | [#9, #10, #8] Administrative and compliance support for legal/PR coordination, records and logistics. |
| Site Director / Executive Staff | 1 | [#4] Senior on-site leadership and decision-making for operations and external coordination. |
Confidence Notes
Estimates follow analyst-provided ranges and reasonable midpoints; one-time construction and retrieval costs are relatively well-bounded. Major uncertainty remains in the scale and duration of the global disinformation campaign, government cooperation variability, and low-probability catastrophic/legal exposure costs, so overall confidence is medium.