SCP-3220
Safe
~
medium confidence
SCP-3220
Expected annual
$1.0M
One-time setup
$60.5M
Annual recurring
$680K
Personnel
6
One-time setup and contingency funding are dominated by potential large-scale remediation and a contingency reserve; ongoing annual costs (~$680k/yr) are driven by security, site management, monitoring, and legal/cover requirements.
One-Time Capital Costs
Total: $60.5M
Annual Recurring Costs
Total: $680K/yr
Cost Scenarios
📊
Baseline
(baseline)
$680K/yr
Normal year with no major incidents; routine security, monitoring, testing, and administrative costs only.
no_incident
routine_operations
🚨
Minor Incident
$880K/yr
Localized leak, minor contamination event, or small breach requiring emergency mobilization and remediation.
small_leak
localized_contamination
temporary_hazmat_response
🚨
Exploration Authorized
$1.9M/yr
Authorization to instrument or explore the interior chamber (robotics/deep-bore campaign) with large one-time equipment spend and increased research activity.
policy_change
authorized_exploration
robotics_deployment
🚨
Catastrophic Remediation
$58.7M/yr
Policy decision or catastrophic event forces full infill/remediation of the 1 km chamber with major engineering and environmental mitigation.
policy_mandate
environmental_disaster
major_contamination
Personnel
6 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 3 | [#5] Rotating local security guards/contractors (2–4 estimated; 3 used for budgeting). |
| Site Manager / Executive Staff | 1 | [#18] Full-time site manager to oversee contracts, reporting, and on-site operations. |
| Research Scientist / Technical Coordinator | 1 | [#18, #8] Part-time scientific coordinator / technical lead for sampling and liaison with labs. |
| Administrative Staff | 1 | [#18] Part-time admin to manage permits, logistics, and recordkeeping. |
Confidence Notes
Analyst notes provide detailed line-item ranges for most costs, giving reasonable precision for ongoing operations; however large optional/contingency items and wide ranges on property/legal and large-scale remediation introduce material uncertainty.