SCP-3282
Keter
~
medium confidence
SCP-3282
Expected annual
$5.3M
One-time setup
$7.5M
Annual recurring
$4.9M
Personnel
8
First-year one-time setup costs are dominated by infrastructure and a large contingency reserve (~$7.51M one-time); recurring annual operations run approximately $4.93M/yr, driven primarily by staff wages, research, deployments, and a reconstruction contingency.
One-Time Capital Costs
Total: $7.5M
Annual Recurring Costs
Total: $4.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.9M/yr
Normal year with scheduled full-moon procedures, routine research, and no major incidents.
scheduled_full_moon_deployments
routine_maintenance
no public manifestations
🚨
Minor Incident
$5.2M/yr
Localized equipment loss or limited public sighting requiring extra replacements, amnestics, and a few unscheduled deployments.
drone_or_sensor_loss
small_public_sighting
extra_containment_deployment
🚨
Major Breach
$6.9M/yr
SCP-3282 manifests outside the cave or causes significant local infrastructure damage requiring larger reconstruction and mobilization.
manifestation_outside_cave
significant_local_damage
large_amnestic_response
🚨
Catastrophic Escalation
$14.9M/yr
Widespread public exposure or a sustained multi-site manifestation requiring mass amnestics, evacuations, large engineering response and drawing contingency reserves.
widespread_public_exposure
multiple_manifestations
need_for_mass_amnestics_and_relocation
Personnel
8 total
| Role | Count | Notes |
|---|---|---|
| Field Researcher / On-site Technician | 3 | [#5] Three personnel stationed at the surveillance cabin (nightly monitoring, dream journals, rotations). |
| EEG Technician | 2 | [#9, #10] Two EEG/clinical technicians responsible for twice-weekly brainwave monitoring and equipment operation. |
| Neuropsychologist | 2 | [#10, #11] Two neuropsychologists conducting evaluations, interviews, and dream content analysis. |
| Data Analyst | 1 | [#10, #11] One data analyst for indexing, ML analysis and maintaining long-term storage/cataloging. |
Confidence Notes
Many line items are explicitly estimated in analyst notes (moderate confidence), but major uncertainties remain around robotics loss rates, scale of reconstruction events, and the long-term research program size, so totals carry material variance.