SCP-3307
Euclid
~
medium confidence
SCP-3307
Expected annual
$1.6M
One-time setup
$2.9M
Annual recurring
$1.6M
Personnel
16
Initial one-time capital and containment modifications are significant (~$2.9M), driven by containment cell work, specialized lab instruments, long-term research program, and a large low-probability reserve. Annual operating costs are dominated by personnel, research, and readiness (~$1.57M/yr).
One-Time Capital Costs
Total: $2.9M
Annual Recurring Costs
Total: $1.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.6M/yr
Normal operational year with no major incidents; ongoing staffing, research, waste treatment, and readiness maintained.
no breach
routine operations
scheduled research and maintenance
🚨
Minor Incident
$1.7M/yr
Small containment incident or limited public exposure requiring extra cleanup, short-term medical follow-up, PR payouts, and additional testing.
single-person exposure
accidental produced-food ingestion by civilian
localized contamination requiring extra disposal
🚨
Major Breach
$3.1M/yr
Containment failure or mass exposure requiring large-scale emergency response, reserve deployment, mass medical screening, legal action, and possible site remediation.
containment failure
mass exposure
public disclosure requiring heavy remediation
Personnel
16 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 9 | [#10] Nine guards total to cover three shifts (3 per shift) as specified in analyst notes. |
| Medical Officer / Nurse | 2 | [#10, #7] Two medical/med-tech staff for sedation, monitoring and emergency care; supports training and recurring medical consumables. |
| Site Technician / Maintenance | 1 | [#10, #23] One site technician for cell maintenance, plumbing/ventilation and generator/testing. |
| Research Scientist | 2 | [#11, #12] Two research scientists (midpoint of 1–3) responsible for biochemical analysis and study design included in research salaries. |
| Lab Technician | 2 | [#11, #13] Two lab technicians to run assays, sample prep, cold-chain handling and instrument operation; included in research operating costs. |
Confidence Notes
Analyst notes provide detailed line-item ranges allowing reasonable mid-point estimates; however large ranges, choice between onsite vs contracted services, frequency assumptions for transports and incidents, and the discretionary long-term research program introduce significant uncertainty.