SCP-3313 Keter ~ medium confidence
SCP-3313
Expected annual
$23.8M
One-time setup
$249.6M
Annual recurring
$12.0M
Personnel
56
Initial containment and repair capital costs are dominant (~$250M one-time) driven by SRA acquisition/installation and Site-88 repairs; recurring annual operations (staff, SRA power, monitoring and research) are ~ $12M/year.
🏗️ One-Time Capital Costs Total: $249.6M
Facilities $141.3M
[#1, #9, #11, #18] Chamber retrofit (floor 46), Site-19 humanoid cell, Site-88 structural repairs, and redundant generator/install are grouped here. Midrange estimates used from notes.
Equipment $64.7M
[#2, #6, #7, #8, #19, #25] SRA capital/spares, remote manipulation robotics, initial hardened sensors/recorders, sound-isolation/failsafe hardware, transport capsule, and initial forensic tooling.
Contingency Reserve $25.0M
[#17] Emergency reserve fund for escalated reality events; midrange reserve used.
Insurance Reserve $10.0M
[#26] Insurance / reputational mitigation reserve (set-aside for third-party liabilities).
Recovery Operation Budget $5.0M
[#13] Per-primary recovery attempt budget (air/sea/ground task force); typical single-attempt planning figure.
Legal And Cover Operations $2.0M
[#16] One-time contingency for legal/diplomatic/cover work during major incidents.
Public Safety Per Event $1.0M
[#20] Public safety / local response budget per significant predicted landing event.
Orbital Tracking Campaign $500K
[#12] One-time intensive satellite/surveillance modelling campaign; midrange $500k.
Per Move Operation Cost $50K
[#19] Per-move operational cost for transport (per relocation); separate from capsule purchase.
Initial Research And Lab Setup $0
[]
🔄 Annual Recurring Costs Total: $12.0M/yr
Staff Wages $5.7M/yr
[#4, #5, #10, #14, #22] Security staffing, containment engineering/SRA technicians wages, humanoid subject staffing, MTF Kappa-12 operational staffing, and hazard pay/screening costs. Midrange staffing and fully-loaded salary estimates used.
Research And Monitoring $3.4M/yr
[#15, #21, #23, #25] Research/testing budget, long-term HUMINT/intelligence monitoring for SCP-3313-1, training/exercises, and recurring forensic staffing/analysis.
Facilities Maintenance $2.3M/yr
[#3, #7, #8, #18] Continuous SRA power & utilities, sensor storage/maintenance, sound-isolation calibration and generator fuel/maintenance.
Supplies And Consumables $600K/yr
[#5, #4, #24] Spare parts/consumables for SRA & containment engineering, security equipment maintenance, PPE and routine consumables.
Logistics And Transport $0/yr
[]
Cover Story And Legal $0/yr
[]
Cost Scenarios
📊 Baseline (baseline) $12.0M/yr
55.0% probability / year
Normal year with containment maintained, no recovery operation or major incidents.
stable_containment routine_maintenance
🚨 Recovery Attempt $20.1M/yr
40.0% probability / year +$8.1M vs baseline
Predicted landing requires a primary recovery attempt and local response (one event in the year).
predicted_landing field_recovery public_area_landing
🚨 Major Breach $182.5M/yr
5.0% probability / year +$170.5M vs baseline
Major escape/Incident-Omega-like event causing destruction to containment floors and SRA systems requiring large-scale repairs/replacement.
site_escape SRA_destruction Incident_Omega_like
👥 Personnel 56 total
Role Count Notes
Security Officer / MTF Agent 20 [#4] Site-88 multi-shift armed guards and rapid reaction force (midpoint staffing).
MTF Operative 15 [#14] Mobile Task Force Kappa-12 operatives assigned to monitoring/recovery operations.
Engineer / Maintenance 8 [#5] Containment engineering, electrical/systems and cryogenics technicians (midpoint staffing).
Research Scientist 6 [#15] Scientists and analysts performing containment-testing and modeling.
Forensic Analyst 2 [#25] Audio/video/cyber forensic specialists for incident investigation and logging.
Medical Officer 2 [#10] On-call medical staff for humanoid containment and medical readiness.
Administrative Staff 3 [#22] Admin/liaison/support for screening, psychological care coordination and legal liaison.
📋 Confidence Notes
Estimates are midrange selections from wide analyst ranges; several items (SRA costs, site repairs) have large inherent uncertainty and some overlap in analyst notes (e.g., SRA costs appear in both item 1 and 2). Scenario probabilities are judgment calls based on containment history and the object's trajectory.
← SCP-3312 ↑ All SCPs SCP-3314 →