SCP-337
Euclid
~
medium confidence
SCP-337
Expected annual
$1.3M
One-time setup
$1.5M
Annual recurring
$1.3M
Personnel
11
One-time capital of approximately $1.53M for construction, precision doors, specialized systems and lab capital; recurring costs ~ $1.31M/yr driven primarily by security staffing, research salaries, administrative overhead, and contingency/reserve funds.
One-Time Capital Costs
Total: $1.5M
Annual Recurring Costs
Total: $1.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.3M/yr
Normal year with routine operations, no major incidents; all recurring systems functioning.
scheduled maintenance
routine research activity
periodic training/drills
🚨
Minor Incident
$1.4M/yr
Localized containment incident requiring repairs, limited medical treatment, overtime and small legal/PR actions.
small containment breach/escape attempt
minor structural or equipment damage
medical treatment for injured staff
🚨
Major Breach
$3.8M/yr
Significant containment failure with major structural damage, emergency response, large-scale repair/rebuild, litigation and replacement equipment.
large-scale escape/ignition
facility fire or collapse
multi-team emergency containment
Personnel
11 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | 6 guards to provide 24/7 coverage with rotation and leave/backfill per [#10]. |
| Research Scientist | 1 | Primary investigator assigned to SCP-337; included in research salaries [#16]. |
| Research Technician | 2 | Two technicians supporting imaging, sample prep, and experiments; included in research salaries [#16]. |
| Medical Officer / Technician | 1 | Med tech providing sedation/monitoring during procedures (noted as ~0.2 FTE in cost notes) [#13, #15]. |
| Trichology / Medical Oversight | 1 | 0.5 FTE medical/trichology oversight for grooming/compliance inspections and examinations [#14]. |
Confidence Notes
Analyst notes provide detailed line items and ranges enabling mid-range estimates, but significant uncertainty remains due to anomalous behavior, site-specific construction variance, and low-probability/high-impact incidents.