SCP-3376
Safe
~
medium confidence
SCP-3376
Expected annual
$1.7M
One-time setup
$2.2M
Annual recurring
$1.7M
Personnel
9
First-year capital needs are dominated by tank/tidal simulation hardware, facility retrofit, and specialized remote-handling and monitoring equipment; expected recurring annual costs are driven primarily by staff wages, ongoing research, and consumables.
One-Time Capital Costs
Total: $2.2M
Annual Recurring Costs
Total: $1.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.7M/yr
Normal year with no major incidents; routine research, maintenance, and operations proceed as planned.
routine_operations
scheduled_research_and_maintenance
🚨
Minor Incident
$1.8M/yr
Localized equipment failure (pump or filter), short power outage requiring contractor mobilization and emergency repairs, limited service interruptions.
pump_failure
short_power_outage
minor_contamination
🚨
Major Breach
$2.7M/yr
Significant containment failure or structural damage causing extensive repairs, possible public exposure mitigation and legal action.
structural_failure
large_spill
public_contact
🚨
Research Scale Up
$2.2M/yr
Significant research breakthrough or grant requiring rapid scale-up: purchase of advanced on-site instrumentation and temporary staffing expansion.
major_grant_awarded
promising_discovery
Personnel
9 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist / Senior Researcher (Marine Microbiologist / Geobiologist) | 1 | [#11] Principal investigator-level research staff included in payroll. |
| Geologist / Paleontologist | 1 | [#11] Geological and paleontological expertise for shell dating and sediment analyses. |
| Aquarium Technician | 2 | [#11] Daily husbandry, tank maintenance and life-support operations. |
| Research Technician / Analyst | 1 | [#11] Sample processing, data logging and experimental support. |
| Safety Officer / Medic | 1 | [#11, #13] Medical monitoring, on-site safety, and post-exposure observation duties. |
| Security Officer / Guards | 3 | [#12] Restricted-access security staffing for 24/7 site protection and badge control. |
Confidence Notes
Estimates are based on detailed analyst ranges and canonical containment requirements but remain order-of-magnitude due to local labor/energy variability, procurement choices, and the optional nature of some capital acquisitions.