SCP-3440
Unknown
~
medium confidence
SCP-3440
Expected annual
$4.3M
One-time setup
$8.2M
Annual recurring
$4.2M
Personnel
32
Initial one-time setup and contingency reserves are the main drivers (structural repairs, specialized enclosures, EM mitigation and large contingency reserves), with ongoing personnel costs (security, monitoring, research) dominating annual expenditures.
One-Time Capital Costs
Total: $8.2M
Annual Recurring Costs
Total: $4.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.2M/yr
Routine year with no major incidents: normal monitoring, maintenance, and personnel operations.
routine_operations
no_public_exposure
scheduled_maintenance
🚨
Minor Incident
$4.7M/yr
Localized public exposure or limited anomalous discharge requiring targeted amnestic operations, legal payouts, and minor repairs.
localized_public_exposure
targeted_amnestic_operations
minor_repair_and_legal_fees
🚨
Major Breach
$6.7M/yr
Significant containment breach or forced-access attempt causing large-scale exposure, structural damage, and extensive emergency operations.
forced_access_attempt
large_scale_public_exposure
structural_damage_and_heavy_repairs
Personnel
32 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent (embedded) | 6 | [#3] Covert Foundation operatives embedded in Civic Opera security staff (salaries + hazard pay included in staff_wages). |
| Security Officer / Guard (on-site contingent) | 12 | [#4] Dedicated on-site guards covering shifts, relief, patrols and supervision (wages and overtime included in staff_wages). |
| Monitoring Staff / Watch Officer | 5 | [#11] Continuous monitoring personnel for sensors/feeds (4–6 estimated; mid-point used here). |
| Research Scientist (senior) | 3 | [#12] Senior researchers on anomalous-research team (salaries included in staff_wages). |
| Research Scientist (junior) | 4 | [#12] Junior researchers supporting cataloguing and analysis. |
| Technician / Lab Tech | 2 | [#12] Technical staff for conservatorship, sample handling and instrumentation operation. |
Confidence Notes
Analyst notes provide many line-item estimates and ranges which makes cost aggregation reasonably reliable, but the anomalous/electro-thaumic nature of SCP-3440, conditional high-cost forced-entry scenarios and discretionary reserve sizes introduce material uncertainty.