SCP-3469
Safe
~
medium confidence
SCP-3469
Expected annual
$1.7M
One-time setup
$362K
Annual recurring
$1.6M
Personnel
10
One-time startup costs are modest (~$362k) for secure storage, initial analytical campaigns and covert-tracing setup; annual recurring costs are dominated by personnel, ongoing lab analysis, disposal/transport, legal/PR and contingency reserves (~$1.61M/yr). Personnel, lab analysis, disposal/logistics and contingency reserves are the main recurring drivers.
One-Time Capital Costs
Total: $362K
Annual Recurring Costs
Total: $1.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.6M/yr
Normal year with routine seizures, analysis, maintenance and program operations; no major public exposure or large-scale recalls.
routine seizures
ongoing research
standard monitoring
🚨
Minor Incident
$1.8M/yr
Localized public exposure or small retail cluster requiring targeted recalls, extra field missions and emergency legal/PR support.
localized recall
small-scale PR/legal response
increased field seizures
🚨
Major International Recall
$3.6M/yr
Widespread market distribution or cross-border incident triggering national/international recalls, heavy legal action, large forensic operations and substantial PR/buybacks.
national/international recall
widespread media exposure
large cross-jurisdictional enforcement
Personnel
10 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 1 | [#3] One dedicated security officer assigned to the secure area (full-time). |
| Field Operative / Agent | 4 | [#6] 4-person seizure/field team for retrievals and covert acquisitions. |
| Research Scientist | 2 | [#9] Two research scientists/materials chemists dedicated to study and characterization. |
| Laboratory Technician | 1 | [#9] One lab technician to support sample prep and analyses. |
| Evidence / Forensics Technician | 1 | [#7] One evidence technician for chain-of-custody, processing and barcoding. |
| Program Manager / Administrative Staff | 1 | [#25] One program manager (part-time allocation expressed as one headcount) for oversight, reporting and budget coordination. |
Confidence Notes
Line items and cost ranges are well scoped in the analyst notes, but many quantities (number of cabinets, vehicles, team sizes, and ops tempo) are assumptions; estimates are reasonable midpoints but subject to program scale choices and regional cost variation.