SCP-350
Safe
~
medium confidence
SCP-350
Expected annual
$3.4M
One-time setup
$4.0M
Annual recurring
$3.3M
Personnel
22
First-year capital and setup costs are driven by a large contingency reserve, secure containment fit-out, and instrumentation (~$3.96M one-time). Recurring annual costs are dominated by staffed security, tactical response, and research/operational support (~$3.35M/yr).
One-Time Capital Costs
Total: $4.0M
Annual Recurring Costs
Total: $3.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.3M/yr
Normal year with no major incidents; routine research, containment, and monitoring operations only.
no_significant_incidents
routine_operations
🚨
Minor Incident
$3.6M/yr
Single signatory event requiring tactical response, short-term ICU support, forensic cleanup, and limited legal/financial intervention.
single_signatory
forced_medical_support
small_scale_recovery_operations
🚨
Major Incident
$4.3M/yr
Multiple signatories or a signatory committing violent acts requiring large tactical operations, terminations/cover-ups, substantial legal work, and replenishment of operational stocks.
multiple_signatories
violent_escalation
major_recovery_and_cover_up
🚨
Catastrophic Escalation
$6.3M/yr
High-severity escalation (orders to remove SCP from containment, mass exposures, or large-scale coerced actions) requiring activation of catastrophic mitigation reserve and major redeployments.
removal_attempt
mass_exposure_or_orders
activation_of_escalation_reserve
Personnel
22 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#4] 24/7 on-site security staffing (2 per shift × 3 shifts = 6 guards) |
| Tactical Response Team | 8 | [#5] Specialized tactical operatives on-call for breaches and recoveries (shared-site team) |
| Research Scientist / Technician | 4 | [#7] PI + 2–3 researchers/technicians dedicated to study and experiments |
| Psychiatrist / Psychologist (Medical Officer) | 2 | [#8] Psych support staff for screening, crisis intervention, and post-signing care |
| Incident Investigator / Internal Affairs | 2 | [#22] Investigation and audit staff for incidents and audits |
Confidence Notes
Analyst notes provide detailed line-item estimates and ranges; totals use midpoints for ranges and combine multiple shared-cost assumptions. Uncertainty remains due to wide per-incident cost variability and optional contingency sizing.