SCP-3523
Euclid
~
medium confidence
SCP-3523
Expected annual
$966K
One-time setup
$2.4M
Annual recurring
$945K
Personnel
20
Estimated initial one-time setup and reserves are approximately $2.4M, driven mainly by civil containment contingency, equipment, and contingency reserves; baseline recurring costs are approximately $945k/yr, driven by staff wages, bi-monthly trimming operations, monitoring/analysis, and administrative overhead.
One-Time Capital Costs
Total: $2.4M
Annual Recurring Costs
Total: $945K/yr
Cost Scenarios
📊
Baseline
(baseline)
$945K/yr
Normal year with scheduled trimming, routine monitoring, and no major incidents.
routine_trims
regular_monitoring
no_incidents
🚨
Minor Incident
$1.0M/yr
Small containment incident requiring emergency excavation/repair, additional lab analyses, and moderate PR/legal work.
localized_breach
emergency_excavation_or_repair
🚨
Media Exposure
$1.1M/yr
Local or regional media attention requiring significant cover operations, legal response, and accelerated containment measures.
witness_reports
viral_social_media_or_local_news
🚨
Major Breach
$3.4M/yr
Significant containment failure / accelerated subterranean growth requiring major civil engineering, large-scale excavation, mass response, and public mitigation.
rapid_subsurface_growth
large_scale_spread
public_exposure
Personnel
20 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 4 | [#4] Four security personnel to provide twice-daily patrols and visible deterrence; wages included in staff_wages. |
| Quick Reaction Force / MTF Agent | 4 | [#5] Nearby rapid-response tactical team on-call for containment breaches and extractions; wages/training budget included in staff_wages. |
| Field Technician / Biohazard Technician | 6 | [#6, #7] Rotating pool of 4–6 biohazard-trained technicians to perform bi-monthly trimming operations and on-site decontamination; PPE and consumables budgets cover supplies. |
| Research Scientist | 1 | [#10, #11] Scientist to oversee pathology, sequencing, and analysis planning; recurring analysis budgets cover per-sample costs. |
| Lab Technician | 1 | [#9, #10] Technician support for sample preparation, chain-of-custody, and coordination with Site-39 incineration and analysis workflows. |
| Engineer / Maintenance | 1 | [#12, #24] On-call engineer for structural stabilization inspections, scaffolding maintenance, and power/system upkeep. |
| Administrative Staff | 1 | [#16, #22] Project manager/administrator handling procurement, compliance, SOP management, and recordkeeping. |
| Medical Officer | 1 | [#17] Occupational health lead for staff medical surveillance, vaccinations, and exposure response coordination. |
| Driver / Logistics | 1 | [#8, #15] Driver/escort for refrigerated transport runs to Site-39 and liaison with contracted heavy-equipment crews. |
Confidence Notes
Cost ranges are derived from detailed analyst notes, but major uncertainty remains around growth rate, amount of tissue trimmed, subsurface extent, and whether heavy civil works or large reserves will be required; contingency reserves were included to reflect these uncertainties.