SCP-3528
Euclid
~
medium confidence
SCP-3528
Expected annual
$3.3M
One-time setup
$7.4M
Annual recurring
$3.3M
Personnel
25
First-year capital expenditures are roughly $7.2M driven by construction of a large reinforced, sound‑isolated aviary and specialized detection/response equipment; recurring annual operations are roughly $3.30M driven by staff wages, research, veterinary care, and ongoing maintenance/supplies.
One-Time Capital Costs
Total: $7.4M
Annual Recurring Costs
Total: $3.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.3M/yr
Normal year with routine operations, no major incidents.
no breach
routine research and maintenance
standard feeding and monitoring
🚨
Minor Incident
$3.5M/yr
Localized containment incident (minor structural damage, small escape quickly recontained) requiring repairs, PR/legal response and temporary operational surge.
localized breach
small structural or sensor damage
limited public exposure requiring PR/legal response
🚨
Major Breach
$5.8M/yr
Significant containment failure or high-profile incident (aircraft damage, serious structural damage, public exposure) requiring large legal/compensation payouts, major repairs and emergency response.
large breach
aircraft incident
public/political exposure
Personnel
25 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 12 | [#9] 24/7 security personnel for perimeter and internal patrols; estimate based on 8–12 guards suggested. |
| Control Room Operator | 3 | [#9, #10] Sensor/CCTV operators and alarm monitoring staff. |
| Research Scientist | 2 | [#12, #13, #23] Senior researchers leading acoustic and biological research. |
| Research Technician | 2 | [#12, #13] Lab technicians supporting sequencing, imaging and sample prep. |
| Veterinarian / Vet Tech | 2 | [#7] Veterinary staff to care for SCP and prey animals, plus emergency response. |
| Engineer / Maintenance | 2 | [#16, #18] HVAC, structural and equipment maintenance staff for facility systems and nets. |
| Administrative Staff | 2 | [#8, #26] HR, program management, legal liaison and administrative support for cover operations. |
Confidence Notes
Estimates are built from analyst ranges in the notes; many line items (acoustic isolation, R&D, legal risk) have large ranges and scenario frequency is subjective, so totals are approximate but grounded in the provided ranges.