SCP-3600
Thaumiel
~
medium confidence
SCP-3600
Expected annual
$11.9M
One-time setup
$513.8M
Annual recurring
$10.6M
Personnel
66
Initial capital costs are dominated by secure facility construction and a large contingency reserve; ongoing annual costs are driven by specialized staff wages, global intelligence/field operations, and cover/legal operations. Baseline annual operating cost is approximately $10.58M, with episodic incidents able to spike expenditures substantially.
One-Time Capital Costs
Total: $513.8M
Annual Recurring Costs
Total: $10.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$10.6M/yr
Normal year with routine operations, monitoring, and no major recovery/deployment beyond expected maintenance and program activity.
no_incidents
routine_operations
🚨
Minor Incident
$11.6M/yr
Single localized SCP-3600-2 recovery or exposure requiring rapid-response deployment, targeted amnestics and legal/cover actions.
single_SCP-3600-2_detection
localized_recovery
🚨
Major Breach
$85.6M/yr
Multiple coordinated SCP-3600-2 constructions or a wider leak requiring large international recoveries, mass amnestic operations and extended intelligence actions.
multiple_device_deployments
significant_public_exposure
🚨
Catastrophic Breach
$510.6M/yr
Large-scale dissemination of SCP-3600 knowledge or activation of SCP-3600-2 devices on an order that threatens civilization-level outcomes, requiring full contingency activation.
widespread_knowledge_dissemination
simultaneous_multi-region_activation
Personnel
66 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 12 | [#11] 24/7 armed guards and supervisors to staff onsite security rotations and response teams (approx. 8–12 guards + supervisors, mapped to security staffing costs). |
| Research Scientist | 8 | [#12, #20] Cognitohazard researchers and linguists supporting Project Theia and ongoing research (part of scientific staff costs and Project Theia operations). |
| Research Engineer / ML Engineer | 3 | [#6, #7, #12] AOCRS developers, ML engineers and secure systems engineers required for model development and maintenance. |
| Rapid Response Team / EOD | 6 | [#13] Rapid-recovery and EOD/anomalous-device specialists on-call for SCP-3600-2 recovery and neutralization operations. |
| Project Theia Operational Staff | 10 | [#19, #20] Staff specific to Project Theia operations: program managers, test coordinators, ethical board liaisons, and additional security/medical staff for controlled exposures. |
| Medical Officer | 2 | [#16, #21] Medical staff for amnestic administration, monitoring and long-term care programs. |
| Engineer / Maintenance | 3 | [#1, #4, #10] Facility and equipment engineers for vault maintenance, remote-handling hardware, welding and workstation upkeep. |
| Administrative Staff | 2 | [#22, #23] Administrative and legal/cover support staff to manage front companies, procurement and liaison work. |
| Class-D Personnel | 20 | [#18] D-Class population maintained for testing under Project Theia protocols (headcount reflects operational pool supported by D-Class program recurring costs). |
Confidence Notes
Most line items are concrete engineering, staffing and recurring-program costs (medium confidence). Uncertainty arises from the large, intentionally order-of-magnitude contingency reserve and the unpredictable frequency/severity of SCP-3600-2 incidents, which drive wide variance in scenario costs.