SCP-3603 Safe ~ medium confidence
SCP-3603
Expected annual
$1.1M
One-time setup
$1.8M
Annual recurring
$1.0M
Personnel
8
Estimated one-time capital of $1,840,000 driven primarily by habitat construction, reinforced perimeters, and seed cold-storage setup; ongoing annual operations ~ $1,031,650/yr driven by staff wages, security, veterinary care, and research/monitoring.
🏗️ One-Time Capital Costs Total: $1.8M
Facilities $1.1M
[#1, #6, #7] Construction/purchase and installation of a walk-in refrigerated seed cell and 3 nature-habitat enclosures (naturalistic space, shelters, drainage, double-door airlocks) plus reinforced perimeters for each habitat; includes foundations, airlocks, and structural work to resist burrowing and mass attacks. Estimate based on mid-range habitat cost ($250k each) and perimeter ($100k each) and $40k for dedicated cold-storage room.
Scaling Redundancy Capital Contingency $200K
[#29] Capital contingency fund to allow rapid scaling / redundancy (extra habitat capacity, duplicated systems) if proliferation occurs.
Equipment $176K
[#2, #3, #8, #10, #13, #14, #16, #25, #26] Initial purchase and installation of environmental monitoring/alarm systems (#2), cold-chain transport crates (#3), per-habitat surveillance hardware (#8), initial capture/response equipment (#10, #14), initial sedative stockpile (#13), cross-contamination hardware/footbaths (#16), sample cold-storage hardware (#25), and containment-specific software development (#26).
Initial Research And Lab Setup $175K
[#17, #27] Initial research project funding and laboratory instrumentation contingency for materials/analysis (chemical pigment analysis, behavioral/genomic studies) and conservative physics contingency (mass-loss investigation equipment).
Insurance Reserve Fund $100K
[#28] Initial internal contingency reserve / incident fund (one-time capitalization of a reserve).
Permitting And Compliance Setup $20K
[#22] One-time costs to fabricate initial cover paperwork, false permits, and consultant setup to simulate legal compliance during program start.
Wildlife Team Initial Training $20K
[#10] Initial specialized wildlife-response/capture team training (large-animal capture, sedation protocols) per analyst estimate.
Documentation And Sop Initial $15K
[#23] Initial documentation, SOP creation, training material production, and administrative setup.
Personnel Initial Training $4K
[#4] Initial containment technician training (~$2k/person for 2 technicians as estimated).
🔄 Annual Recurring Costs Total: $1.0M/yr
Staff Wages $560K/yr
[#4, #9, #11] Salaries for containment technicians (2 @ ~$60k), security guards (4 @ ~$50k), one on-site veterinarian (~$120k) and a research/project head (~$120k).
Research And Monitoring $123K/yr
[#2, #8, #17, #18, #26, #27] Ongoing monitoring/calibration contracts for environmental sensors and surveillance, active research project funding (chemistry/behavior/genomics), contingency physics investigations, drills and incident exercises, and software maintenance.
Scaling Redundancy Operational Contingency $100K/yr
[#29] Operational contingency to cover rapid scaling of staffing, feed, vet care, and security if the population of SCP-3603-1 grows beyond forecast (2–5x ops cost buffer).
Cover Story And Legal $75K/yr
[#21] Annual legal retainers, PR campaigns, cover identity maintenance, and incident response to preserve secrecy.
Supplies And Consumables $44K/yr
[#3, #12, #13, #14, #15, #16, #30] Consumables including dry ice/coolant and transport supplies, animal feed/enrichment, sedative resupply, replacement PPE/consumables for capture equipment, decontamination supplies per habitat, consumables for cross-contamination prevention, and miscellaneous yearly replacements.
Facilities Maintenance $40K/yr
[#1, #7, #20] Annual maintenance for cold-storage units and habitat/perimeter repairs from wear-and-tear due to powerful animals; includes periodic reinforcement and mechanical services.
Insurance Reserve Replenishment $25K/yr
[#28] Annual replenishment/contribution to contingency reserve to ensure funds are available after incidents.
Logistics And Transport $10K/yr
[#3, #10] Vehicle/transport upkeep, fuel, and logistics to move seeds/instances safely between facilities or to emergency sites; also minor transport-related equipment maintenance.
Training And Recertification $10K/yr
[#10] Ongoing recertification and refreshers for wildlife-response/capture team and annual practical drills.
Permitting And Compliance Maintenance $10K/yr
[#22] Ongoing costs to maintain fabricated compliance paperwork and consultants for cover organizations.
Documentation And Admin $10K/yr
[#23] Ongoing SOP updates, administrative staff time, and recordkeeping.
Utilities And Power $8K/yr
[#24] Electricity and utility costs for refrigeration, habitat climate simulation, pumps, and security systems.
Sample Storage And Testing $6K/yr
[#25] Cold storage rental/consumables and periodic testing of powder/tissue samples.
Euthanasia And Carcass Disposal $5K/yr
[#19] Per-carcass disposal costs (incineration/biosecure rendering) averaged over expected annual terminations.
Psychological Screening And Counseling $5K/yr
[#5] Regular mental-health screening and counseling access to address acute paranoia reported when viewing SCP-3603.
Cost Scenarios
📊 Baseline (baseline) $1.0M/yr
85.0% probability / year
Normal year with no major incidents: steady operations, routine research, standard staffing and maintenance.
no escapes routine research activity standard staffing levels
🚨 Minor Incident $1.1M/yr
12.0% probability / year +$50K vs baseline
Localized enclosure damage or single-instance escape/capture requiring overtime, temporary repairs, and veterinary care.
partial enclosure breach single animal escape/recapture targeted repair and overtime
🚨 Major Breach $1.8M/yr
3.0% probability / year +$800K vs baseline
Multi-habitat breach or aggressive, large-scale escape requiring extended recapture operations, major repairs, legal exposure, and possible replacement of infrastructure.
mass escape multiple habitats compromised significant infrastructure damage
👥 Personnel 8 total
Role Count Notes
Containment Technician 2 Trained techs handling seed storage, cold-chain loading/unloading, SOP compliance. (See #4)
Security Officer / MTF Agent 4 On-site guards for 24/7 coverage and wildlife-response; staffing level supports shifts. (See #9)
Veterinarian 1 On-call or full-time zoo vet experienced with ursids for routine and emergency care. (See #11)
Research Scientist / Project Head 1 Project lead responsible for approvals, research oversight, and authorization workflows. (See #17, #23)
📋 Confidence Notes
Analyst notes provide detailed line items and ranges, enabling a mid-confidence estimate; wide cost ranges per line item and uncertain population/scale (number of colors/habitats) create substantial variance, so figures are representative but not precise.
← SCP-3602 ↑ All SCPs SCP-3604 →