SCP-3637
Euclid
~
medium confidence
SCP-3637
Expected annual
$10.2M
One-time setup
$44.2M
Annual recurring
$10.2M
Personnel
130
Initial one-time capital/setup is approximately $44.2M, driven primarily by the perimeter barrier, museum buildout, water-deterrent system and site acquisition; ongoing annual operations are about $10.2M/yr, dominated by guard wages, rapid-response teams and monitoring staff.
One-Time Capital Costs
Total: $44.2M
Annual Recurring Costs
Total: $10.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$10.2M/yr
Uneventful year with standard monitoring, maintenance, and routine operations; no major 3637-Ramah escalation or breaches.
no_major_storms_over_site
standard_operations_only
🚨
Minor Incident
$10.5M/yr
Localized 3637-Ramah event produces a single wandering SCP-3637-1 instance that requires on-site response, short repairs, and per-event cleanup.
single_storm_event
instance_requires_response_and_cleanup
🚨
Major Breach
$12.7M/yr
Escalated event like Incident 3637-A where an instance scales, breaches the barrier, requires large-scale response, repairs, potential litigation and accelerated excavation/transfer.
instance_scales_and_breaches
failed_deterrence
extensive_property_or_infrastructure_damage
Personnel
130 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 96 | [#3] Guards posted every 200 m around the 1 km radius (32 posts × 3 shifts = 96 positions). |
| Operations / Monitoring Operator | 11 | [#6] Central monitoring/ops center 24/7 staffing: 9operators + 2 supervisors (~11 total). |
| Rapid Response Team / MTF Agent | 16 | [#10] Two rapid-response teams of 8 personnel each (16 total) to operate hoses, vehicles, and manage incidents. |
| Research Scientist | 3 | [#16] Core research staff (geochemistry, behavior, memory studies) funded within research program recurring budget. |
| Museum Staff (curator/docent/security) | 4 | [#15] Museum front staffing included in recurring operations and cover story, conservative estimate of curator/docents/security on the payroll. |
Confidence Notes
Analyst notes provide detailed line-item estimates and reasonable midpoints, but site-specific variables (land costs, local labor rates), event frequency uncertainty for anomalous behavior, and assumptions about staff/operation splits reduce confidence from high to medium.