SCP-3656
Neutralised
~
medium confidence
SCP-3656
Expected annual
$12.9M
One-time setup
$790.8M
Annual recurring
$2.4M
Personnel
14
One-time capital and optioned remediation dominate costs (total one-time estimate driven by large-scale soil remediation and institutional controls). Baseline recurring operations for containment, monitoring, security and stewardship are modest by comparison at a few-million dollars per year, driven by staff wages, insurance, monitoring and long-term stewardship.
One-Time Capital Costs
Total: $790.8M
Annual Recurring Costs
Total: $2.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.4M/yr
Normal contain-and-monitor year with routine monitoring, patrols, maintenance and stewardship; no major incidents or remediation actions.
no_major_incident
routine_monitoring_and_stewardship
🚨
Minor Incident
$3.2M/yr
Localized breach, trespasser exposure, or small accidental disturbance requiring emergency response, targeted remediation and legal action.
fence_breach
localized_contamination_spread
vehicle_or_worksite_accident
🚨
Major Remediation
$502.4M/yr
Decision or regulatory mandate to pursue full-scale soil excavation and licensed disposal (large-scale remediation project year).
regulatory_mandate
availability_of_disposal_capacity
decision_to_remediate
🚨
Catastrophic Breach
$77.4M/yr
Large accidental release, severe weather damage to containment, or wide-area contamination event requiring mass medical response, remediation and legal settlements.
severe_weather_or_structural_failure
major_containment_breach
large_third-party_exposure
Personnel
14 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 8 | [#4] Staff for perimeter patrols, alarm response and gate/vehicle operations (24/7 rotation coverage). |
| Research Scientist | 2 | [#7, #16] Environmental sampling, lab analysis, data interpretation and reporting. |
| Site Director / Executive Staff | 1 | [#11, #13] Oversight, regulatory liaison, stewardship management and executive decisions. |
| Medical Officer | 1 | [#10] Occupational health, dosimetry program oversight and medical monitoring. |
| Engineer / Maintenance | 1 | [#15, #9] Infrastructure, power/communications, sensor maintenance and decon equipment upkeep. |
| Administrative Staff | 1 | [#5, #24] Records, permitting paperwork, community liaison and cover-story administration. |
Confidence Notes
Analyst notes provide detailed line items and ranges for most categories (security, monitoring, remediation options), allowing mid-confidence estimates for recurring and one-time baseline costs. Large uncertainties remain around remediation scope, waste-disposal capacity and regulatory decisions (orders-of-magnitude variance), which lowers confidence for optioned one-time remediation costs.