SCP-3658
Euclid
~
medium confidence
SCP-3658
Expected annual
$11.5M
One-time setup
$616.9M
Annual recurring
$9.5M
Personnel
45
One-time capital and contingency reserves dominate costs (notably superconducting magnet/cryogenics, secure RF-shielded vault, and space-retrieval reserve). Recurring costs are driven by specialized staff wages, continuous monitoring/array operations, maintenance contracts, and contingency reserves.
One-Time Capital Costs
Total: $616.9M
Annual Recurring Costs
Total: $9.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$9.5M/yr
Uneventful year with normal operations, monitoring, maintenance, and staff payroll.
no equipment failure
no unexpected disappearance
routine monitoring only
🚨
Minor Incident
$13.0M/yr
Localized equipment failure or critical component replacement (e.g., magnet/power supply/pump) requiring emergency procurement and expedited repairs.
superconducting magnet failure
major vacuum or cryo failure
critical electronics destruction
🚨
Space Retrieval Escalation
$309.5M/yr
Catastrophic escalation requiring an urgent dedicated space mission / large-scale retrieval/intercept within the inner solar system.
SCP-3658-1 disappearance and reappearance out of monitoring range
decision to perform kinetic/planetary retrieval
failure of remote observation to localize
Personnel
45 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist / Physicist | 4 | [#13] Senior trap/particle physicists to run experiments and interpret results. |
| Technician (Cryo / RF / Electronics) | 6 | [#13] Cryogenic technicians, RF engineers, and electronics techs for day-to-day operations. |
| Software Engineer / Data Analyst / Cryptographer | 8 | [#12] Signal analysis, computational linguistics, cryptanalysis, and DAQ/software support. |
| Security Officer / MTF Agent | 16 | [#14] 24/7 armed guards, rotation and rapid-reaction elements for site security. |
| Site Director / Executive Staff / Administrative | 3 | [#29] Program managers, procurement, compliance and administrative staff. |
| Engineer / Maintenance | 3 | [#7, #18] Facilities engineers for power, HVAC, UPS/generator and maintenance coordination. |
| Rapid-Reaction Team (RRT) | 4 | [#14] On-call small intervention team for urgent physical interventions or secure transport events. |
| Medical Officer | 1 | [#23] Medical/psychological monitoring and staff health oversight. |
Confidence Notes
Analyst notes provide detailed component-level ranges enabling order-of-magnitude estimates; major uncertainties remain around low-probability high-cost items (space retrieval, legal/cover-up extremes) and operational choices (dedicated array vs. telescope time), so confidence is medium.