SCP-3691
Anomalous
~
medium confidence
SCP-3691
Expected annual
$1.1M
One-time setup
$1.0M
Annual recurring
$1.1M
Personnel
12
One-time setup costs (~$1.01M) are dominated by specialized-containment contingency, replica/installation, and research/lab setup; recurring annual costs (~$1.085M/yr) are driven primarily by personnel (security + research staff), ongoing research/monitoring, and a contingency reserve.
One-Time Capital Costs
Total: $1.0M
Annual Recurring Costs
Total: $1.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.1M/yr
Normal year with no major incidents: ongoing security, research, monitoring, and reserves only.
no_public_incidents
routine_research_and_maintenance
🚨
Minor Incident
$1.1M/yr
Localized public exposure or small incident requiring a single rapid deployment, limited amnesticization, and short forensic/PR effort.
small_public_exposure
limited_media_footage
single_MTF_deployment
🚨
Major Escalation
$2.0M/yr
Significant anomalous escalation (e.g., animation/uncontained behavior) requiring hardened vault construction, large-scale deployments, intensive research scale-up, and mass witness management.
object_animation
large_public_exposure
hardened_vault_construction
Personnel
12 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#4] Continuous 24/7 guard coverage (minimum 6 full-time guards to staff three shifts). |
| Research Scientist | 2 | [#7, #8, #16] Onsite research staff conducting testing, modeling, and follow-up experiments. |
| Site Director / Executive Staff | 1 | [#16] Site director/manager responsible for program oversight and coordination. |
| Administrative Staff | 1 | [#16, #11] Admin/security coordinator handling scheduling, logistics, and liaison with legal/PR. |
| Engineer / Maintenance | 1 | [#5, #15] Technical support for CCTV, monitoring hardware, scientific equipment maintenance and field instrumentation. |
| Medical Officer | 1 | [#10, #17] Medical/psychological support for staff and witness management/amnestic procedures. |
Confidence Notes
Analyst notes provide detailed line-item ranges but many items are conditional and behavioral outcomes (object escalation) are uncertain; cost ranges and contingency choices introduce moderate uncertainty.