SCP-3725
Euclid
~
medium confidence
SCP-3725
Expected annual
$3.2M
One-time setup
$11.1M
Annual recurring
$3.2M
Personnel
20
Estimated one-time capital/setup costs are about $11.1M driven primarily by construction of Provisional Site-3725, mobilization, and the contingency reserve; recurring annual costs are about $3.17M driven mainly by staff wages (primary + island), logistics/resupply, and legal/containment operations.
One-Time Capital Costs
Total: $11.1M
Annual Recurring Costs
Total: $3.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.2M/yr
Normal year with routine operations, no major incidents.
routine staffing and resupply
standard research and containment operations
🚨
Minor Incident
$3.3M/yr
Localized increase in SCP-3725-1 activity requiring additional field responses, small buyouts or emergency incineration sorties.
spike in SCP-3725-1 beachings
small-scale public exposure or removal operations
🚨
Major Breach
$5.7M/yr
Significant population surge or public exposure requiring large-scale eradication, emergency buyouts and reconstruction of facilities.
widespread theatrical dissemination or publication
large SCP-3725-1 population growth or coordinated attempts on facilities
Personnel
20 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 10 | Primary site security (6) and island security/field patrol (4) as implied by #6 and #15. |
| Research Scientist | 5 | Primary site researchers (3) plus island/field researchers (2) supporting translation and narrative analysis (#6, #19, #15). |
| Medical Officer | 2 | Primary site medic (1) and island medic/rotational (1) for ENT/surgical and medevac support (#6, #15, #4). |
| Engineer / Maintenance / Containment Technician | 1 | Containment techs/maintenance support at primary site (#6) for cell upkeep and equipment maintenance. |
| Station Manager / Field Lead | 1 | Island station manager/field lead included in rotational staffing (#15). |
| Administrative Staff | 1 | Site admin and coordination staff reflected in primary site staffing costs (#6). |
Confidence Notes
Estimates are based on analyst-provided ranges and explicit line-item estimates; many items (island logistics, property costs, contingency needs) are site-dependent and range widely, so overall confidence is medium.