SCP-3836
Euclid
~
medium confidence
SCP-3836
Expected annual
$1.4M
One-time setup
$740K
Annual recurring
$1.3M
Personnel
8
First-year one-time setup costs are moderate-to-high due to secure cell build-out, contingency reserve and specialized equipment; largest recurring costs are specialized staff wages, remote monitoring and cover-story/contingency reserves.
One-Time Capital Costs
Total: $740K
Annual Recurring Costs
Total: $1.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.3M/yr
Normal year with no major incidents; containment stable and regular operations only.
scheduled maintenance
routine feeding/oil changes
regular testing on demolitions range
🚨
Minor Incident
$1.5M/yr
Localized incident (injury, small escape attempt, equipment damage) requiring overtime, repairs and limited external contracting.
equipment damage during testing
small containment breach/repair
medical intervention for staff or SCP
🚨
Major Breach
$2.3M/yr
Significant containment breach or public exposure requiring full recontainment operations, major asset replacement and legal/civil response.
facility breach
public exposure requiring containment/PR/legal response
large-scale recontainment operation
Personnel
8 total
| Role | Count | Notes |
|---|---|---|
| Veterinary / Necrobiology Specialist | 1 | [#6] One full-time specialist (veterinary/pathology experience) responsible for oil changes, necrotic tissue monitoring and medical procedures. |
| Primary Handlers | 2 | [#7] Two dedicated handlers trained to interact with primates/animated corpses (daily care and feeding). |
| Security Officer / MTF Agent | 3 | [#7] Three security escorts to accompany SCP during movement and for rapid response during tests/transports. |
| Containment Technician | 1 | [#8] One containment technician for cell systems maintenance, lockable inventory and material approvals. |
| Site Researcher / Level-3 Oversight (part-time) | 1 | [#8] One Level-3 researcher providing approvals and incident review (0.25 FTE budgeted, represented as one part-time oversight role). |
Confidence Notes
Analyst notes provide line-item ranges and clear operational requirements, enabling a reasoned estimate; uncertainty remains around space-monitoring needs, contingency reserve sizing and frequency of incidents, so confidence is not high.