SCP-3851
Safe
~
medium confidence
SCP-3851
Expected annual
$1.4M
One-time setup
$3.2M
Annual recurring
$1.3M
Personnel
12
Initial capital/setup costs are approximately $3.16M largely driven by land control, civil storm-drain work, ROV/sonar and contingency reserves. Annual operating costs are about $1.34M/year, driven by security staffing, research personnel, liability reserves and contracted emergency/forensic services.
One-Time Capital Costs
Total: $3.2M
Annual Recurring Costs
Total: $1.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.3M/yr
Normal year with routine operations, no major recovery incidents or legal exposures.
routine monitoring
scheduled maintenance
regular research activity
🚨
Minor Incident
$1.4M/yr
Single retrieval event requiring overtime, contracted recovery and additional forensic work.
single corpse retrieval
overtime and extra lab analysis
🚨
Major Breach
$1.7M/yr
Multiple simultaneous recoveries or large-scale recovery requiring heavy equipment, extended contracts, PR/legal actions and community payouts.
multiple recovered corpses
extreme weather causing infrastructure damage
significant public exposure/legal claims
Personnel
12 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#4] Six full-time on-site guards for continuous coverage as specified. |
| Site Manager / Executive Staff | 1 | [#5] Full-time site manager for permits, liaison and reporting. |
| Engineer / Maintenance | 1 | [#5, #6] Full-time maintenance/grounds technician for fence, pumps and vegetation control. |
| Research Scientist | 2 | [#10, #11] Two field scientists dedicated to anomalous research and monitoring. |
| Research Technician | 1 | [#10, #11, #24] Part-time/onsite technician supporting instrumentation, sampling and ROV operations. |
| Administrative Staff | 1 | [#27] Administrative support for payroll, background checks and permits (site-level FTE). |
Confidence Notes
Detailed line-item notes provide a clear structure, but many items have wide local-market ranges (land, buyouts, heavy-recovery contracting) and choice between purchase vs lease or in-house vs contracted services affects totals; this yields medium confidence.