SCP-3868
Keter
~
medium confidence
SCP-3868
Expected annual
$2.9M
One-time setup
$12.1M
Annual recurring
$2.8M
Personnel
12
Initial one-time setup (vault, digital infrastructure, quarantine outfitting and large contingency reserves) is dominated by a multi-million dollar contingency reserve; steady-state annual operations are driven by in-country embedded assets, research, custody support and legal/cover operations totaling a few million per year.
One-Time Capital Costs
Total: $12.1M
Annual Recurring Costs
Total: $2.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.8M/yr
Normal operational year: annual event managed via routine detection, confiscation, archiving, and research with no major incidents.
standard Jan 17 event
no significant public backlash
no embed exposure
🚨
Minor Incident
$3.1M/yr
Heightened public exposure or localized resistance requiring extra takedowns, extra legal payouts, and increased confiscation ops.
viral online spread
local legal challenge
compromised embed
🚨
Contingency Activation
$10.8M/yr
Activation or near-activation of Contingency 73-Waitangi / major political-military scenario requiring mobilization of emergency reserves, large-scale constitutional replacement operations and international diplomacy.
73-Waitangi trigger conditions
K-Class precursor activation
nation-scale constitutional intervention
Personnel
12 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 4 | [#11] Researchers conducting interviews, experiments and analysis (wages included in staff_wages). |
| Cyber Operator / Cyber-ops | 2 | [#4] Continuous monitoring and takedown team (wages included in staff_wages). |
| Security Officer / MTF Agent | 4 | [#10] Custody and rapid-response security staff for detainee supervision and field ops (wages included in staff_wages). |
| Medical Officer / Psychologist | 1 | [#10, #9] Medical/psych support for detainees and medical checks (wages included in staff_wages). |
| Database / Records Specialist | 1 | [#18] Records management, data-entry and archival metadata (wages included in staff_wages). |
Confidence Notes
Notes provide detailed line-item ranges for most operational costs (vaults, embeds, cyber, research), allowing medium-confidence estimates; the primary uncertainty is the scale and probability of Contingency 73-Waitangi/K-Class activation which could greatly change one-time and annual spending.