SCP-3938
Safe
~
medium confidence
SCP-3938
Expected annual
$656K
One-time setup
$538K
Annual recurring
$643K
Personnel
4
One-time setup roughly $538,036 (primarily containment retrofit, rapid-response vehicle, initial R&D/contingency and equipment). Recurring annual costs roughly $642,850 driven mainly by staff wages, administrative overhead, contingency replenishment and ongoing R&D/monitoring.
One-Time Capital Costs
Total: $538K
Annual Recurring Costs
Total: $643K/yr
Cost Scenarios
📊
Baseline
(baseline)
$643K/yr
Normal year with routine monitoring, maintenance, and no major incidents or public exposure.
routine_operations
no_incident
standard_testing
🚨
Minor Incident
$678K/yr
Small containment incident (localized flame event, minor equipment damage, single minor medical treatment and small PR/amnestic action).
localized_fire
minor_injury_or_equipment_damage
🚨
Public Exposure
$753K/yr
Visible public sighting/leak (flames/music audible or visible) requiring larger PR/legal response and multiple amnestic deployments.
audible_music_leak
public_flame_sighting
recording_or_media_exposure
🚨
Major Breach
$2.1M/yr
Significant containment breach or large-scale incident (major fire, mass injuries, large public exposure or complex retrieval) requiring large deployment, repairs and legal/medical liabilities.
major_containment_failure
large_public_incident
multi-person_injuries
Personnel
4 total
| Role | Count | Notes |
|---|---|---|
| Containment Technician | 2 | [#6] Two FTEs (shift coverage, inspections, battery changes, hands-on maintenance) as specified in analyst notes. |
| Research Scientist | 1 | [#7, #12] Level-3+ researcher (0.5–1.0 FTE used here as 1.0 FTE) for testing, interviews and experiment planning. |
| Medical Officer | 1 | [#9, #15] Part-time medic/physician oversight consolidated as 1 headcount for on-site program medical responsibilities and post-ride care. |
| MTF On-Call / Security (contracted) | 0 | [#8] Rapid-response MTF/reserve personnel are contracted/on-call; costs included in staff_wages/on-call budget but not counted as permanent on-site headcount. |
Confidence Notes
Line items and cost ranges are well-specified in analyst notes (medium confidence), but many optional program-level escalations and sparse historical incident data produce wide variance; contingency/R&D choices drive most uncertainty.