SCP-398
Euclid
~
medium confidence
SCP-398
Expected annual
$1.6M
One-time setup
$3.9M
Annual recurring
$1.6M
Personnel
13
Initial one-time setup is approximately $3.88M driven by land/site work, structural containment, specialized vacuum/door systems, instrumentation and a large contingency reserve. Recurring annual costs are approximately $1.59M driven primarily by personnel wages, ongoing research/monitoring, energy and maintenance.
One-Time Capital Costs
Total: $3.9M
Annual Recurring Costs
Total: $1.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.6M/yr
Normal uneventful operational year with scheduled maintenance, research activity and no containment incidents.
normal_operations
scheduled_maintenance
🚨
Minor Incident
$1.7M/yr
Localized equipment failure or single-personnel loss requiring emergency response and moderate replacement/medical costs.
pump_or_actuator_failure
minor_breach_or_personnel_injury
🚨
Major Breach
$2.6M/yr
Significant containment breach or equipment destruction requiring large-scale replacement, cleanup, containment reinforcement and extended response.
multi-door_failure
vacuum_system_catastrophic_failure
extended_cleanup_and_rebuild
🚨
Political Exposure
$2.1M/yr
Local exposure/rumor/political pressure forces expensive legal mitigation, buyouts, and enhanced media suppression.
unauthorized_disclosure
local_official_attention
media_coverage
Personnel
13 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent (front-line guards) | 6 | [#11] Six guards to maintain minimum two-at-doors per shift with rotation; salary assumptions ~ $50k/guard median. |
| Security Supervisor / Escort Team | 2 | [#12] One-to-two full-time supervisors / armed response; budgeted as two supervisors/escorts (~$80k each median). |
| Engineer / Maintenance (containment technicians) | 3 | [#13] Two-to-four FTEs; modeled as three skilled technicians to operate vacuum/HV systems and perform maintenance. |
| Research Scientist | 2 | [#14] One-to-three researchers; modeled as two researchers for observational studies and experiment planning. |
Confidence Notes
Line-item cost ranges and staffing numbers are well-documented in the analyst notes, enabling reasonable mid-range estimates; however the anomalous nature and uncertain failure modes of SCP-398 (Euclid) introduce risk to contingency and breach frequency estimates, limiting confidence.