SCP-4003
Safe
~
medium confidence
SCP-4003
Expected annual
$5.3M
One-time setup
$12.8M
Annual recurring
$5.2M
Personnel
37
Initial capital and land control dominate one-time costs (~$12.75M), while ongoing personnel (security + scientific staff) and research/monitoring drive recurring expenses (~$5.205M/yr). Major cost drivers are land/site establishment, specialized scientific programs (Department of Temporal Anomalies), and 24/7 security/monitoring.
One-Time Capital Costs
Total: $12.8M
Annual Recurring Costs
Total: $5.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$5.2M/yr
Normal operational year without major incidents; regular excavation, research, security, and cover operations proceed as planned.
no breach
routine research and transport
standard staffing and maintenance
🚨
Minor Incident
$5.5M/yr
Localized containment incident or leak (unauthorized civilian entry, small media exposure, single-specimen damage) triggering modest emergency response, additional legal/PR, amnestic operations and repairs.
unauthorized perimeter breach
small media leak
equipment failure during season
🚨
Major Breach
$7.7M/yr
Significant exposure or containment failure (large-scale media/public exposure, major specimen loss/damage, protracted litigation) requiring major emergency rentals, legal settlements, large-scale PR and long-term remediation.
large public exposure
mass specimen damage or loss
major litigation or whistleblower campaign
Personnel
37 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 14 | [#5] 24/7 security rotations and supervisors as described (~4 guards/shift × 3 shifts + 2 supervisors ≈ 14 FTE). |
| Research Scientist | 10 | [#6, #15] Senior specialists (archaeologists/paleontologists/geologists) per note (#6: 10senior specialists). |
| Field Technician | 8 | [#6, #8, #26] Field techs for excavation, equipment operation and seasonal campaigns (8 techs referenced in #6). |
| Conservator / Cataloger / Admin | 3 | [#6, #9, #25] Conservators and cataloging/admin support (budgeted separately in #6 and conservation projects #25). |
| Groundskeeper / Maintenance Contractor | 2 | [#30] Ongoing monitoring & site maintenance staffing (groundskeepers/seasonal contractors). |
| Administrative Staff / Data Manager | 0 | [] Administrative/database costs are budgeted in archival/database infrastructure (#27) as capital and maintenance rather than additional full-time hires. |
Confidence Notes
Many line items are explicitly estimated in analyst notes (medium confidence in aggregates), but uncertainties remain around shared capital with Site-11, legal/cover-up variability, and research scaling which could materially change costs.