SCP-4010
Keter
~
medium confidence
SCP-4010
Expected annual
$2.9M
One-time setup
$112.8M
Annual recurring
$2.8M
Personnel
26
First-year capital and setup expenditures are dominated by recommended contingency/reserve allocations, producing a one-time cost of $112,830,000; ongoing annual operations run approximately $2,770,500/yr, driven primarily by continuous human watchers, security/QRF and specialized response teams, plus legal/OPSEC and research support.
One-Time Capital Costs
Total: $112.8M
Annual Recurring Costs
Total: $2.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.8M/yr
Normal year with no major incidents; routine operations and scheduled maintenance only.
no_incident
routine_maintenance
scheduled_training
🚨
Minor Incident
$3.0M/yr
Brief containment breach or local incident requiring overtime, equipment repairs and limited legal/PR response.
watcher_error
localized_damage
short_lockdown
🚨
Major Breach
$5.3M/yr
Significant containment failure requiring full site lockdown, extended response teams, major repairs and large legal/PR operations.
multi-shift_watch_failure
structural_damage
partial_public_exposure
🚨
Catastrophic Breach
$52.8M/yr
Full containment collapse with public exposure and mass-casualty consequences; national-level emergency response and litigation.
complete_containment_failure
widespread_public_exposure
mass_casualties
Personnel
26 total
| Role | Count | Notes |
|---|---|---|
| Primary Watcher | 9 | [#5] Two-person continuous observation requirement covered by 9 FTE (shift coverage & relief). |
| Security Officer / QRF Agent | 6 | [#6] Dedicated on-site security/quick reaction force for perimeter and breach response. |
| Hazmat Response / Breach Team | 6 | [#7] Specialized hazardous-object containment team with medics for breach entry and casualty response. |
| Research Scientist / Lab Tech | 2 | [#15] Research staff for behavioral study, forensic analysis and sample handling (2 FTE). |
| Float / Relief Watcher | 3 | [#26] Additional float coverage to cover windows of vulnerability and reduce single-point-of-failure risk. |
Confidence Notes
Operational staffing, equipment and routine maintenance costs are well-defined in the analyst notes; however the scale and probability of catastrophic, societal and legal costs are highly uncertain and materially affect total one-time and contingent budgets.