SCP-403 Safe ? low confidence
SCP-403
Expected annual
$1.0M
One-time setup
$1.9M
Annual recurring
$986K
Personnel
6
Initial containment and hardening require substantial capital upgrades (approx. $1.9M one-time) driven by blast-rated vault construction, EM hardening and specialized equipment; recurring annual operations, staffing and contingency allocations run near $1.0M/yr, driven by research staff and dedicated 24/7 security.
🏗️ One-Time Capital Costs Total: $1.9M
Initial Research And Lab Setup $600K
[#25] Long‑term research capital: advanced instrumentation, particle/field labs, high‑precision spectroscopy and related buildout (optional/authorized deep study).
Facilities $597K
[#1, #2, #3, #8] Custom steel safe with fire‑retardant lining, blast‑rated secondary vault/room, EM shielding installation, and HVAC/venting one‑time buildout.
Equipment $452K
[#4, #5, #6, #7, #9, #11, #12, #20, #21, #27] Hardened monitoring equipment and spares (initial), specialized sensors, remote handling robotics, fire suppression system installation, UPS/generator purchase, initial security gear, access control hardware, initial data logging/archival infrastructure, transport container, and environmental monitoring gear.
Emergency Repair Seed Fund $200K
[#16] One‑time seed for incident response and emergency repairs / rapid replacement of blast panels and vault restoration.
Spare Parts Inventory Initial $60K
[#17] Initial stock of expendable sacrificial wall panels, camera/sensor spares, seals and fasteners.
Personnel Signon Premiums $10K
[#26] One‑time sign‑on/hazard premiums for key staff (combination holder / critical personnel).
🔄 Annual Recurring Costs Total: $986K/yr
Staff Wages $525K/yr
[#10, #14] Salaries, benefits, hazard pay and training for 2x armed guards (24/7) and dedicated research team (senior researchers + technicians).
Site Overhead Allocated $150K/yr
[#23] Allocated site overhead, utilities, security overhead and lost‑use opportunity cost for dedicating a vault and staff at Site‑██.
Supplies And Consumables $75K/yr
[#15, #17] Experimental consumables and per‑test expendables; ongoing replenishment of spare panels and basic spare parts.
Cover Story And Legal $55K/yr
[#22] Legal, witness management, cover story, records suppression and PR efforts to maintain secrecy.
Research And Monitoring $51K/yr
[#4, #20, #18, #19, #27] Ongoing monitoring, data analysis, archival storage, medical monitoring for staff, training/drills and environmental monitoring maintenance.
Emergency Fund Allocation $50K/yr
[#16] Annual allocation to replenish/maintain the incident response & emergency repair fund.
Administrative Overhead $25K/yr
[#28] Documentation, records management, experiment approval boards and paperwork processing.
Insurance And Audits $15K/yr
[#24] Internal insurance, compliance auditing and regulatory risk assessment budgeting.
Personnel Security And Vetting $15K/yr
[#26] Ongoing psychological evaluations, polygraphs, vetting and small salary premiums/hazard retention pay.
Facilities Maintenance $12K/yr
[#7, #8, #9] Annual maintenance/refill for fire suppression, filter replacement and generator/UPS upkeep.
Logistics And Transport $6K/yr
[#21] Per‑transfer transportation crew/vehicle costs (assumes occasional secure transfer; per‑year expected transfers).
Security Equipment Replacement $3K/yr
[#11] Ongoing replacement and training costs for security equipment (body armor, comms, weapons upkeep).
Custodial Contingency $3K/yr
[#13] Costs for keyholder redundancy procedures, secure duplicate storage, and periodic retraining.
Access Audit $1K/yr
[#12] Annual audit/logging and custody procedure costs for access control and key management.
Cost Scenarios
📊 Baseline (baseline) $986K/yr
94.5% probability / year
Normal year with routine testing, maintenance, and no containment breach or major incidents.
routine_testing regular_maintenance no_incidents
🚨 Minor Incident $1.2M/yr
5.0% probability / year +$200K vs baseline
Localized accidental ignition or small detonation that damages monitoring equipment and vault linings but does not breach site containment.
accidental_repeated_ignition equipment_damage local_vault_repairs
🚨 Major Breach $11.0M/yr
0.5% probability / year +$10.0M vs baseline
High‑yield detonation or escalation during testing causing extensive vault/site damage requiring major repairs, replacement of infrastructure, large‑scale emergency response and extensive cover‑up.
multiple_forbidden_ignitions large_scale_explosion site_level_reconstruction
👥 Personnel 6 total
Role Count Notes
Security Officer / MTF Agent 2 [#10] Two armed, trained guards posted 24/7 as specified; salaries and overhead included in staff_wages.
Research Scientist 2 [#14] Senior researchers dedicated to experiments and analysis; included in research staff salaries.
Technician 2 [#14] Technicians for test setup, remote handling, equipment maintenance and instrumentation; included in research staff salaries.
📋 Confidence Notes
Wide ranges in analyst estimates, the anomalous and potentially exponential escalation of energy output, and optional/contingent high‑end research spending create high uncertainty in both capital and recurring forecasts.
← SCP-402 ↑ All SCPs SCP-404 →