SCP-4040
Unknown
?
low confidence
SCP-4040
Expected annual
$6.2M
One-time setup
$39.7M
Annual recurring
$6.0M
Personnel
34
One-time setup dominated by land acquisition, structural works and a high-risk sinkhole remediation attempt (~$37M). Annual recurring costs are driven by specialized staffing, R&D, equipment replacement and medical/amnestic operations (~$6.05M/yr).
One-Time Capital Costs
Total: $39.7M
Annual Recurring Costs
Total: $6.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$6.0M/yr
Normal year with routine operations, scheduled R&D and expected equipment attrition; no major incidents.
routine_field_ops
scheduled_replacements
ongoing_R&D
🚨
Minor Incident
$6.5M/yr
Localized equipment/probe loss or small civilian exposure requiring targeted amnestics and equipment replacement.
probe_loss
localized_equipment_damage
limited_civilian_exposure
🚨
Major Breach
$10.0M/yr
Large-scale narrative spread or mass civilian exposure requiring town-wide amnestic program, emergency deployments and major equipment/R&D surge.
town_wide_exposure
mass_media_folklore_spread
large_scale_equipment_loss
Personnel
34 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 20 | [#5] 24/7 security staffing to support rotations, expedition escorts and perimeter control (matches security wage estimate). |
| Research Scientist | 6 | [#6, #13, #22] Memetic researchers and lab scientists supporting narrative/pataphysical experiments and R&D. |
| Psychologist | 2 | [#6, #8] Ongoing psychological care and monitoring for personnel working directly with SCP-4040. |
| Communications Tech / Logistics | 3 | [#10, #16, #18] Hardened communications, data handling and field logistics support staff. |
| Site Director / Executive Staff | 1 | [#6, #25] Site commander / program manager responsible for operations and oversight. |
| Medical Officer | 2 | [#9] On-site medics for trauma response, quarantine handling and medical readiness. |
Confidence Notes
Costs are highly uncertain due to pataphysical/ narrative-driven effects, wide ranges in analyst estimates, and the possibility that major one-time remediation (sinkhole encasement) is infeasible; therefore confidence in precise dollar amounts is low.