SCP-4099
Safe
~
medium confidence
SCP-4099
Expected annual
$51K
One-time setup
$154K
Annual recurring
$50K
Personnel
10
One-time engineering controls and administrative safeguards (~$154k) are the main upfront costs (acoustic containment, locker upgrades, transfer container, contingency reserve). Recurring costs (~$50k/yr) are driven by staff wage allocations, contingency reserve allocations, training, monitoring, legal/PR retainer, and consumables.
One-Time Capital Costs
Total: $154K
Annual Recurring Costs
Total: $50K/yr
Cost Scenarios
📊
Baseline
(baseline)
$50K/yr
Normal year with no exposure events; ongoing training, monitoring, consumables, legal retainer, and contingency allocations paid as budgeted.
no exposure
routine audits
annual training
🚨
Minor Incident
$65K/yr
Single-person exposure with limited secondary spread; requires incident consumables, short-term medical care, limited PR/legal response, and possible audio-forensic engagement.
brief accidental exposure
single secondary transmission
🚨
Major Breach
$250K/yr
Significant mismanagement or containment failure causing multiple exposures, extended medical care, large-scale PR/legal actions, potential workers' comp/hospitalization payouts and extended containment response.
multiple-person exposure
secondary spread cascade
civil claims / public exposure
Personnel
10 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 4 | [#4, #5, #12] Authorized security personnel responsible for vault access control, escort and immediate physical response; costs treated as pro‑rata in staff_wages. |
| Research Scientist | 2 | [#6, #21] Memetics/compliance oversight and periodic risk reviews; covered by research_and_monitoring and documentation budgets (pro‑rata). |
| Medical Officer | 1 | [#9, #10, #12] On-call medic for rapid sedation/medical intervention and follow-up monitoring; incremental on-call costs included in staff_wages and supplies. |
| Engineer / Maintenance | 1 | [#1, #3, #11] Responsible for acoustic room maintenance, alarm systems, CCTV modifications; costs largely one-time with minor recurring maintenance. |
| Administrative Staff | 2 | [#6, #15, #22] Maintain redacted logs, access audit trails, and cover-story paperwork; costs reflected in documentation and administrative_overhead. |
Confidence Notes
Item is Safe-class with well-defined memetic hazards and detailed containment notes; many analyst line items provide ranges and site-dependent choices (dedicated FTE vs pro-rata), producing moderate uncertainty in staffing/reserve selections.