SCP-4108
Safe
✓
high confidence
SCP-4108
Expected annual
$2.2M
One-time setup
$4.7M
Annual recurring
$2.1M
Personnel
14
One-time setup estimated at approximately $4.7M for a reinforced, climate-controlled greenhouse, manipulators and lab buildout; main annual drivers are staff wages, facilities maintenance and energy (~$2.12M/yr).
One-Time Capital Costs
Total: $4.7M
Annual Recurring Costs
Total: $2.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.1M/yr
Routine operational year with scheduled maintenance and no major incidents.
normal_operation
scheduled_maintenance
🚨
Minor Incident
$2.3M/yr
Localized equipment failure (e.g., manipulator or HVAC failure) requiring repair/replacement and overtime; short-term operational impacts.
manipulator_failure
HVAC_outage
monitoring_system_loss
🚨
Major Breach
$3.6M/yr
Containment breach or transport accident causing significant infrastructure damage, specimen loss and legal/cleanup costs requiring rebuild or major remediation.
breach_during_transfer
catastrophic_HVAC_failure
major_security_incident
Personnel
14 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist (Level-3/Level-4) | 3 | [#12] 2 × Level-3 botanists/ecophysiologists and 1 × Level-4 researcher for approvals and program oversight. |
| Greenhouse Technician / Horticultural Assistant | 3 | [#13] 3 FTEs for daily plant care, manipulator assistance and routine maintenance (midpoint of 2–4). |
| Engineer / Maintenance (Automation Technician) | 2 | [#14] 2 technicians for manipulators, control systems, HVAC and on-call repairs (1–2 range assumed toward upper reliability). |
| Security Officer / MTF Agent | 6 | [#15] 24/7 coverage estimated at 6 guards (within 4–8 range) to support access control and transfer escorts. |
Confidence Notes
Analyst provided detailed line-item ranges and containment requirements, allowing midpoint-based estimates; site-specific factors (energy rates, local labor, existing infrastructure) still introduce variance.