SCP-4132
Safe
~
medium confidence
SCP-4132
Expected annual
$493K
One-time setup
$1.8M
Annual recurring
$480K
Personnel
4
Estimated one-time setup and contingency funding of approximately $1.82M (main drivers: secure room build-out, decommission contingency, and R&D/analysis). Baseline annual operating cost is roughly $480k/year driven primarily by personnel, legal/cover operations, and monitoring/webcrawler operations.
One-Time Capital Costs
Total: $1.8M
Annual Recurring Costs
Total: $480K/yr
Cost Scenarios
📊
Baseline
(baseline)
$480K/yr
Normal, uneventful year with testing suspended; routine monitoring, personnel, legal/cover, and maintenance costs only.
no authorized testing
no public exposures
routine maintenance and monitoring
🚨
Minor Incident
$640K/yr
Small public listing or isolated civilian sighting requiring targeted interdiction, limited amnestic administrations, legal engagement, and modest specialist consults.
online marketplace listing
isolated civilian exposure
small-scale seizure or buyout
🚨
Major Breach
$1.5M/yr
Significant exposure or incident requiring large-scale interdiction, widespread amnestic deployment, major investigative/legal action, specialist mobilization, and possible decommission planning.
multiple civilian exposures
failed containment during testing
widespread marketplace dissemination
Personnel
4 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist (Level-3) | 1 | [#9] Dedicated Level-3 oversight (pro-rated FTE; one named assignee providing authorization and oversight). |
| Medical Officer / Paramedic (on-call) | 1 | [#8] Onsite or on-call medical coverage for insertions/removals and decontamination (0.5–1.0 FTE equivalent budgeted). |
| Security Officer / Guard (incremental allocation) | 1 | [#10] Incremental guard coverage or fractional allocation for access control and testing operations. |
| Research Technician / Data Analyst | 1 | [#24] Data transcription, analysis, webcrawler review and research support (0.25–1.0 FTE budgeted). |
Confidence Notes
Line items are well-specified but many estimates are wide ranges (notably R&D, decommission, and incident response). The object is Safe and one-room which reduces uncertainty for baseline containment, but anomalous behaviors, possible discoveries, and legal/interdiction events create medium overall cost uncertainty.