SCP-418
Unknown
✓
high confidence
SCP-418
Expected annual
$1.8M
One-time setup
$554K
Annual recurring
$1.7M
Personnel
13
One-time setup approximately $553,500 for containment modifications and specialized equipment; ongoing annual costs approximately $1,736,400 driven primarily by security wages, contingency reserve contributions, and research/monitoring/maintenance.
One-Time Capital Costs
Total: $554K
Annual Recurring Costs
Total: $1.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.7M/yr
Normal year with routine operations, no major incidents.
no_breach
routine_exams
standard_research_activity
🚨
Minor Incident
$1.8M/yr
Small containment incident (medical/separation event or localized breach) requiring overtime, medical response, and possible incineration/disposal.
localized_breach
separation_event_requiring_incineration
overtime_response
🚨
Major Breach
$2.2M/yr
Major escape or loss of custody requiring large-scale recovery operations, contractor support, and use of contingency funds.
full_escape
large_recovery_operation
public_exposure_mitigation
🚨
Mcd Recovery Attempt
$2.0M/yr
Targeted recovery attempt by hostile third party (e.g., MC&D) requiring covert ops/intel and escalated security.
hostile_retrieval_attempt
covert_infiltration
intelligence_operation
Personnel
13 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 10 | [#4] 24/7 specialized guards (3 shifts × 3–4 guards), includes relief coverage; wages accounted in staff_wages. |
| Research Scientist | 1 | [#14] 0.5–1.0 FTE scientist budgeted (rounded to 1); salary portion included in staff_wages and research budget. |
| Technician / Lab Technician | 1 | [#14, #15] Laboratory technician support for assays, equipment maintenance; salary portion included in staff_wages/research budget. |
| Medical Officer | 1 | [#5] Combined physician/nurse coverage (0.25–0.5 MD + 0.5–1.0 nurse); staffing represented as 1 medical role covering required FTEs, wages in staff_wages. |
Confidence Notes
Analyst notes provide detailed, line-item cost ranges and containment requirements, allowing mid-range estimates and reasonable allocation of recurring vs. one-time costs.