SCP-4242
Thaumiel
~
medium confidence
SCP-4242
Expected annual
$10.9M
One-time setup
$9.9M
Annual recurring
$10.8M
Personnel
25
Initial one-time capital of approximately $9.87M is driven primarily by containment R&D prototypes, emergency relocation reserve, and structural retrofits; annual recurring operating costs are roughly $10.75M driven mainly by personnel, field mission tempo, and insurance/legal liabilities.
One-Time Capital Costs
Total: $9.9M
Annual Recurring Costs
Total: $10.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$10.8M/yr
Normal year with planned mission tempo (~10 missions), routine maintenance, and no major incidents.
routine_operations
planned_mission_tempo
🚨
Minor Incident
$11.2M/yr
Minor legal/PR incident or medical event requiring elevated response, limited additional legal and medical costs.
civilian_alarm
small_legal_claim
medical_evacuations
🚨
Mission Surge
$11.8M/yr
Significant increase in mission tempo (e.g., surge to ~20 missions/year) increasing logistics and mission costs.
increased_exploration
diplomatic_outreach_surge
🚨
Catastrophic Relocation
$15.2M/yr
Site destruction triggers emergency relocation/re-establishment: deploy reserve, major reconnaissance and rebuild costs.
site_destruction
forced_relocation
Personnel
25 total
| Role | Count | Notes |
|---|---|---|
| Site Director / Executive Staff | 2 | [#4] Site director and deputy — executive oversight and liaison responsibilities. |
| Security Officer / MTF Agent | 8 | [#4] Plainclothes and facility security personnel (6–12 range; mid estimate 8). |
| Research Scientist | 6 | [#4] Researchers, historians, linguists conducting diplomatic and temporal research. |
| Medical Officer | 2 | [#4] Medics/psychologists for on-site care and reintegration support. |
| Engineer / Maintenance | 3 | [#4] Technicians for HVAC, power, equipment maintenance and site systems. |
| Administrative Staff / Visitor Liaison | 2 | [#4] Visitor desk and liaison staff managing public interactions and coordination. |
| Support / Reserve Operators | 2 | [#4] Float/support staff for overtime and operational surges. |
Confidence Notes
Notes provide detailed ranges for most line items, but significant uncertainty remains around containment/temporal R&D costs, mission tempo, and the frequency/magnitude of relocations—hence medium confidence.