SCP-425
Euclid
~
medium confidence
SCP-425
Expected annual
$3.5M
One-time setup
$506K
Annual recurring
$3.5M
Personnel
7
One-time containment construction and research equipment (~$0.5M) with recurring annual costs dominated by personnel, reserves, and long-term research programs (~$3.49M/yr). Main drivers: security & research staff wages, contingency reserves, and long-term research/liability allocations.
One-Time Capital Costs
Total: $506K
Annual Recurring Costs
Total: $3.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.5M/yr
Normal operational year with no major incidents; routine monitoring, staffing, and scheduled research spending only.
no containment failures
regular broadcasts contained
planned research activity
🚨
Minor Incident
$3.7M/yr
Localized exposure or procedural lapse causing a small number of staff to require urgent care, limited legal/PR action, and incident mobilization.
small containment lapse
single/staff exposure
minor media inquiry
🚨
Major Breach
$8.5M/yr
Significant containment failure or public exposure resulting in mass psychological effects, large legal settlements, and major PR/relocation costs.
containment failure
widespread exposure
public disclosure
🚨
Research Breakthrough Requiring Scale Up
$4.5M/yr
Discovery or evidence that warrants rapid scale-up of localization and non-terrestrial-research program, requiring additional staff and capital.
promising transmission data
external collaboration required
need for expanded instrumentation
Personnel
7 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 4 | [#7] Dedicated 24/7 monitoring/patrol coverage for the containment room (3–4 guards rotating). |
| Research Scientist | 2 | [#10, #23] One or two full-time researchers assigned to study broadcasts, analyze recordings, and lead localization efforts. |
| Engineer / Maintenance | 1 | [#10, #3] Technical support for monitoring equipment, Faraday cage maintenance, and instrument calibration. |
Confidence Notes
Estimates are based on analyst ranges and typical site costs but include large discretionary reserves and contingent items; many items (legal/PR, liability reserves, research scale-up) are highly uncertain, producing medium confidence.