SCP-4251
Safe
~
medium confidence
SCP-4251
Expected annual
$6.6M
One-time setup
$7.7M
Annual recurring
$6.4M
Personnel
35
Initial capital expenditures are approximately $7.75M driven by base construction, UAV/robotics, ruggedized instrumentation and a contingency reserve; annual operating costs are approximately $6.45M/yr driven primarily by security staffing, airlift/logistics, research, and consumables.
One-Time Capital Costs
Total: $7.7M
Annual Recurring Costs
Total: $6.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$6.4M/yr
Normal year with no major incidents; routine operations, maintenance, research and rotations proceed as planned.
routine_operations
scheduled_maintenance
🚨
Minor Incident
$7.2M/yr
Localized equipment failure, small-scale damage from an anomaly cycle, brief medevac or limited political/local incident requiring emergency repair and PR response.
localized_equipment_damage
limited_medical_evacuations
small_public_disclosure
🚨
Major Breach
$9.4M/yr
Significant containment-impacting event causing widespread equipment destruction, extended evacuation/repair, heavy airlift usage, and major legal/liaison expenses.
widespread_equipment_loss
extended_staff_extraction
diplomatic_incident
Personnel
35 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 24 | [#7] Permanent on-site guards and patrol teams providing 24/7 perimeter enforcement. |
| Specialized Tactical Unit / MTF Agent | 8 | [#8] Special ops-grade unit for anomaly incidents, extractions and investigations (includes training overhead in recurring costs). |
| Medical Officer | 3 | [#14] On-site medics and trauma/evac staff covering high-g injury response and medevac coordination. |
Confidence Notes
Mid-confidence: analyst notes provide detailed line-item ranges and clear operational assumptions, but several anomaly-driven failure modes (high/low-g cycles) are uncertain and local political/logistical factors in Myanmar could materially change procurement and recurring costs.