SCP-4260
Euclid
?
low confidence
SCP-4260
Expected annual
$509.2M
One-time setup
$9.6B
Annual recurring
$466.9M
Personnel
161
Initial capital and contingency reserves dominate costs (≈$9.58B one-time), driven by deep subterranean construction, contingency/cover-up funds, and specialized Matrix fabrication; recurring annual operations are substantial (~$467M/yr) led by research/monitoring, global response, energy and personnel.
One-Time Capital Costs
Total: $9.6B
Annual Recurring Costs
Total: $466.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$466.9M/yr
Normal operational year with no Procedure 8917 execution or major containment breach; ongoing operations, staffing, monitoring and maintenance only.
steady_operations
no_major_incident
🚨
Procedure 8917 Event
$478.9M/yr
A year in which Procedure 8917 is executed, requiring concentrated MTF deployments, consumables, staging and post-op processing.
Procedure_8917_executed
joint_MTF_deployment
high_operational_consumables
🚨
Major Breach
$2.5B/yr
Containment failure with widespread exposure requiring large-scale remediation, activation of contingency funds, international cover-up and mass response.
containment_failure
widespread_exposure
mass_casualties
Personnel
161 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist / Essophysicist | 14 | [#6] Estimated specialist cadre (midpoint of 8–20); salaries and retention included under staff_wages. |
| Engineer / Maintenance | 42 | [#7] Technical maintenance staff for 24/7 coverage (midpoint of 24–60); salaries included in staff_wages. |
| Security Officer / MTF Agent | 105 | [#8] Onsite security and guard force (midpoint of 60–150) for underground shifts; MTF external deployments counted as operational costs, not permanent headcount. |
Confidence Notes
Large ranges in analyst estimates, unknown frequency of Procedure 8917, unspecified continuous power draw and multiple choice-dependent design decisions (SMR vs turbines), plus the anomalous/memetic nature of SCP-4260 introduce substantial uncertainty.