SCP-428
Euclid
~
medium confidence
SCP-428
Expected annual
$1.6M
One-time setup
$7.4M
Annual recurring
$1.6M
Personnel
11
Initial capital costs are dominated by biocontainment retrofit, containment cell construction and major safety equipment; recurring costs are dominated by 24/7 armed staffing and dedicated research personnel. Total one-time CAPEX includes a large contingency reserve to cover potential expansion/neutralization.
One-Time Capital Costs
Total: $7.4M
Annual Recurring Costs
Total: $1.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.6M/yr
Routine year with no major incidents; normal operations, scheduled maintenance and planned research.
normal_operations
scheduled_maintenance
🚨
Minor Incident
$1.7M/yr
Small containment incident requiring overtime, minor repairs and incident response.
attempted_absorption
localized_breach
equipment_repair
🚨
Major Breach
$2.6M/yr
Significant containment breach causing casualties, facility damage, emergency neutralization and large-scale response.
successful_escape
mass_absorption
facility_damage
🚨
Containment Expansion
$6.6M/yr
Event forcing expansion or neutralization program (construction of additional suites or large-scale neutralization program).
scaling_absorptions
requirement_for_additional_cells
decision_to_neutralize
Personnel
11 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 8 | [#5] Armed guards on 24/7 rotation (covers leave/rotation). |
| Research Scientist | 2 | [#7] Two Level-3 researchers dedicated full-time to SCP-428 research. |
| Lab Technician / Research Assistant | 1 | [#7] Technician for sample handling, assays and lab support. |
Confidence Notes
Estimates are built directly from analyst line items and known salary/contract figures, but several optional choices (incinerator purchase vs contract, BSL level, expansion scope) and SCP behavior uncertainties introduce material variance; figures are order-of-magnitude budget-level estimates.